Site work and paving for a sidewalk / parking lot in Sheldon, Iowa. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Work to Be Done: Work generally consists of approximately 1,440 linear feet of existing alley removal and replacement to include, but not limited to: - Grading, Excavation, Subgrade Preparation and Modified Subbase - Adjustment of Sanitary Sewer Structures - 5" P.C. Concrete Sidewalk - 6" P.C. Concrete Pavement - Pavement Removals - Painted Pavement Markings - Temporary Traffic Control - Erosion Control Items - Alternate 1: Subgrade Treatment, Cement Stabilization See Bid Form for exact quantities Proposals: All proposals shall be made on official proposal forms furnished by the Engineer and shall contain worded and figured prices for the work bid on. All proposals shall be plainly legible, sealed, and addressed to the City of Sheldon, Attn: Sam Kooiker, City Manager, 416 9th Street, Sheldon, IA 51201. Bidder shall submit a Bidder Status Form with their bid. Failure to submit a fully completed Bidder Status Form with the bid may result in the bid being deemed unresponsive and rejected. Bid security shall be provided in the form of a cashier's check or certified check drawn on a state chartered or federally chartered bank, or a certified share draft drawn on a state chartered or federally chartered credit union, or a bid bond of a reputable bonding company authorized to do business in the State of Iowa in an amount not less than ten percent (10%) of the total amount of the bid. The bid security shall be included in a separate sealed envelope, plainly marked "bid bond". The bid security shall be forfeited as liquidated damages if the successful bidder fails proper execution of the contract documents. The bid security of the lowest two or more bidders may be held for the earlier of 7 days after the effective date of the agreement or 61 days after the bid opening, whereupon Bid Security furnished by such bidders will be returned. Other bid security will be returned after the tabulation of bids is completed. Performance and Payment Bonds: The successful bidder must execute performance and payment bonds, each in an amount equal to one hundred (100%) percent of the contract amount to ensure a timely, efficient, and complete performance. The bonds shall be issued from a reputable bonding company authorized to do business in the State of Iowa. Liquidated Damages: Liquidated damages will be assessed the contractor in the amount of five hundred dollars ($500.00) per working day that the work remains uncompleted after the end of the contract period with due allowances for extensions due to conditions beyond the control of the contractor Withdrawal of Bids: No submitted bids may be withdrawn for a period of thirty (30) days from the scheduled closing time for the receipt of bids. Payment: The Contractor will be paid monthly in an amount equal to ninety-five percent (95%) of the Work completed during the previous month according to the Engineer's estimate. The final payment will be made not less than thirty (30) days after completion of the Work and acceptance by the City. No final payment will be due until the Contractor has certified that the materials, labor, and services have been paid for in accordance with the Project Manual. Acceptance or Rejection of Bids: The right to accept or reject any or all bids and to waive informalities is reserved. Time Frame: The work shall be completed as follows: Division I: Work shall be substantially completed within 20 working days once commenced All work shall be completed by July 29, 2022 Division II: Work shall be substantially completed within 20 working days once commenced All work shall be completed by July 29, 2022 Division III: Work shall be substantially completed within 22 working days once commenced All work shall be completed by July 29, 2022 By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa In accordance with Iowa statutes, a resident bidder shall be allowed a preference as against a nonresident bidder from a state or foreign country if that state or foreign country gives or requires any preference to bidders from that state or foreign country, including but not limited to any preference to bidders, the imposition of any type of labor force preference, or any other form of preferential treatment to bidders or laborers from that state or foreign country. The preference allowed shall be equal to the preference given or required by the state or foreign country in which the nonresident bidder is a resident. In the instance of a resident labor force preference, a nonresident bidder shall apply the same resident labor force preference to a public improvement in this state as would be required in the construction of a public improvement by the state or foreign country in which the nonresident bidder is a resident. The award of the contract will be made to the lowest responsive, responsible bidder.

Bid Results

Sidewalks / Parking Lot

$566,445.00

Public - City

Paving, Site Work

48

10

2

6

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
23
Active Projects
17
Bidding Soon
208
All Active Projects
105
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 18, 2022

February 17, 2022

img_map_placeholder

Multiple Locations, Sheldon, IA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.