BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 29, 2022 at 7:00 PM

Updated January 26, 2024

Site work for a civil project in Houston, Texas. Completed plans call for site work for a water / sewer project.

This program provides the improvements to various well sites and pump stations. Improvements include valve and piping rehabilitation/replacement; Rehabilitate/replace electrical switchgear, motor control components, automatic transfer switches and electrical generation support equipment. Work of the Contract is for construction of Facilities Improvements at Various Well Sites and Re-Pump Stations. The improvements are at'16 locations for the following 18 wells: 1. District 111 Well-01 9603 Cook Road; Houston, TX 77099 2. District 51 Well-01 4325 Baynard Drive, Houston, TX 77072 3. District 54 Well-3A :3322 Crossview Drive, Houston, TX 77063 ; 4. Ridgemont Well-02 5230 Castlecreek Lane, Houston, TX 77053 5. Bellaire Braes Well-02 11331 Carvel Lane, Houston, TX 77072 6. Bellaire Braes Well-06A 8222 S. Dairy Ashford Road, Houston, TX 77072 7. Bellaire Braes Well-06B 8222 S. Dairy Ashford Road, Houston, TX 77072 _ 8. Sims Bayou Well-03 13825 Blue Ridge Drive, Houston, TX 77085 9. Sims Bayou Well-04 12445 Hodges Street, Houston, TX 77085 10. Southwest Well-01A 5210 Westpark Drive, Houston, TX 77056 11. Southwest Well-03A 5730 Westpark Drive, Houston, TX 77057 12. Southwest Well-03SB 5730 Westpark Drive, Houston, TX 77057 13. Southwest Well-04A 6002 Westpark Drive, Houston, TX 77057 14. Southwest Well-05A 6302 Westpark Drive, Houston, TX 77057 15. Southwest Well-08 8700 Westpark Drive, Houston, TX 77063 16. Southwest Well-09 4410 Westpark Drive, Houston, TX 77027 17. Southwest Well-10 4426 S.W. Freeway, Houston, TX 770 18. Southwest Well-11 9120 Westpark Drive, Houston, TX 77063 The work is for the improvements to 18 wells located at 16 different locations. The sites are located apart from another and within the City of Houston limits. The work in general, to be performed under this Contract consists of, but is not limited to, the following general tasks, which are more specifically described in the Contract Drawings and other Sections of these specifications- Repair concrete sealing block and pump base. Remove and replace existing blowoff box. Replace pipe supports Repair or replace sections of fence as called out on the drawings. This may include new fabric, poles, and barbed wire Remove and replace existing well discharge and blowoff piping Estimate value: $10,266,600.00 - CONTRACT TIME - 784 days MBE (13%), WBE (7%)

Bid Results

Water / Sewer

$8,537,700.00

Public - City

Site Work

154

16

13

3

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
381
Active Projects
144
Bidding Soon
3,761
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2022

March 28, 2022

Project location map

To Be Determined, Houston, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.