Site work and new construction of an educational facility in Morehead, Kentucky. Conceptual plans call for the construction of a educational facility; and for site work for a educational facility.
Project Overview This scope of work is for an engineering assessment of KY00029 Clements Lake Dam, located on the campus of Morehead State University. The project includes a review of available information for the dam, in-depth engineering inspection of the dam and identification of deficiencies, hydraulic and hydrologic (H&H) analyses, geotechnical exploration and laboratory testing, and slope stability analyses, and development of remediation alternatives for any deficiencies identified. Other tasks include twodimensional breach analysis and development of an Emergency Action Plan and Probable Failure Modes Analysis (PFMA). Primary Project Objectives o Review available information and identify critical data gaps. o Provide a better understanding of the condition of the dam and identify deficiencies by performing an in-depth inspection of the dam and an updated H&H analysis, geotechnical exploration, and geotechnical analyses. o Determine risks posed by the dam by performing a breach analysis and Potential Failure Mode Analysis (PFMA) o Provide risk mitigation by developing and coordinating an Emergency Action Plan. o Develop conceptual alternatives to bring the dam into compliance with state dam safety standards. Project Tasks o Data Collection and Review - Review files associated with the dam. KDOW will provide access to the files for the dam. Coordinate with Morehead State University for information. Provide a summary of identified data gaps that will require attention in subsequent tasks. o In-Depth Field Inspection - Perform a detailed engineering inspection of the dam to determine the current condition and identify any deficiencies. Provide a stamped inspection report to KDOW detailing observations made and deficiencies identified. o Survey - Perform a topographic survey of the dam and a bathymetric survey of the reservoir. Provide information in digital format, including a 3-dimensional terrain surface and stage-areastorage data for the reservoir. Survey downstream hydraulic structures and lowest floor elevations of all structures potentially impacted by a breach of the dam to support the breach analysis task. o Hydrologic & Hydraulic Analyses - Perform H&H analyses to determine the current hydraulic characteristics and capacity of the dam. Compare results to regulatory requirements and provide report. o Geotechnical Exploration - Perform a geotechnical exploration and laboratory testing program to gather baseline information about the dam embankment and foundation to support geotechnical stability analysis. Develop a geotechnical exploration plan and boring plan for KDOW review and approval. Install observation wells and pressure transducers (Solinst Levellogger 5 with L5 Direct Read Cables) to observe and record internal water levels. Submit a report of findings. o Geotechnical Stability Analysis - Perform an analysis of the structural stability of the structure including the following loading cases: long-term steady-state seepage under normal operating conditions, rapid drawdown (upstream face only), and seismic loading. o Potential Failure Mode Analysis (PFMA) - Perform a Potential Failure Mode Analysis and provide a report of findings. o Breach Analysis - Perform a two-dimensional unsteady flow breach analysis and inundation mapping. o Emergency Action Plan - Develop an Emergency Action Plan following the guidelines of FEMA P64. Coordinate with stakeholders and conduct a table top exercise review. o Develop Conceptual Remediation Alternatives - Based on the assessment develop conceptual repair alternatives to address unacceptable risks at the dam related to deficiencies identified. Include an opinion of probable construction costs. o Reporting - All results of the above assessments are to be provided to KDOW in report form with all digital supporting data. Deliver report(s) as drafts for KDOW review and comment prior to issuing final report(s). o Project Management - Provide project management for the project including the following: monthly progress meetings, kick-off meeting with KDOW at the start of the project, meetings to review the results of the analyses outlined above, meeting to review recommendation and identify conceptual alternatives, EAP tabletop exercise and stakeholder meeting and final project close out meeting. Tentative Project Schedule March 1, 2022 Notice to Proceed March 31, 2022 Data Review Complete June 30, 2022 Field Inspection, Survey, Geotechnical Exploration Plan Complete July 31, 2022 Geotechnical Exploration Complete, Breach Analysis Complete, H&H Analysis Complete, Draft EAP Sept 30, 2022 PFMA Complete, Geotechnical Analysis Complete, Final EAP Complete Dec 31, 2022 EAP Stakeholder Meeting and Tabletop Exercise, Draft Assessment Report with Remediation Alternatives Jan 31, 2023 Final Report
Conceptual
Educational
$500,000.00
Public - State/Provincial
New Construction, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 9, 2023
150 University Blvd, Morehead, KY
Related To This Project
Morehead, KY
Bid Date: Jan 27 2022
Morehead, KY
Bid Date: Mar 15 2022
Morehead, KY
Bid Date: Feb 15 2022
Morehead, KY
Bid Date: Mar 15 2022
Morehead, KY
Bid Date: Jun 07 2022
Morehead, KY
Bid Date: Oct 07 2021
Morehead, KY
Bid Date: Oct 06 2023
Morehead, KY
Bid Date: Sep 28 2023
Morehead, KY
Bid Date: Sep 19 2023
Morehead, KY
Bid Date: Oct 09 2023
Morehead, KY
Bid Date: Aug 25 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.