BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 12, 2022 at 8:00 PM

Updated September 15, 2023

Renovation of a municipal facility in New York, New York. Completed plans call for the renovation of a municipal facility.

Award Details Contract Award Date: Sep 08, 2022 Contract Award Number: 140P2022C0029 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: VQBWWV4D5MK5 Contractor Awarded Name: LOUIS C ALLEGRONE INC Contractor Awarded Address: , MA 01240-2390 USA Base and All Options Value (Total Contract Value): $22150000 STLI-256938, Statue of Liberty National Monument, Rehabilitate Terreplein at Fort Wood (GAOA Project), New York County, New York a) The National Park Service (NPS), Department of Interior (DOI), Denver Service Center (DSC), is soliciting proposals on a full and open basis from all interested businesses having the capability to perform the work described below. All responsible sources may submit an offer for consideration in accordance with these and other terms and conditions of the solicitation. The North American Industrial Classification System (NAICS) code and the associated small business size standard are noted in clause 52.204-8 in section "K" of this solicitation. b) Estimated Price Range: More than $10,000,000. c) An organized pre-proposal site visit will be held at 10:30 am EDT on Tuesday, May 24, 2022, followed by a site walkthrough. Refer to section "L" for information regarding the site visit and proposal submittal requirements. d) Information and requirements stated in sections "B" through "J" & attachments noted in section "J" apply to this solicitation and the subsequent contract. e) Requirements noted in sections K, L, and M apply to this solicitation. f) Pre-proposal questions shall be submitted no later than seven (7) days prior to the proposal submission due date. Do NOT submit questions through FedConnect. Submit The method of contractor selection has not been determined at this time. 5__8_0_______ calendar days The Contractor shall be required to (a) commence work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 580 calendar days after notice to proceed Estimated Price Range: More than $10,000,000 The NPS subcontracting goals for Fiscal Year 2022 are: Small Businesses (44%), Small Disadvantaged Businesses (5%), Women-Owned Businesses (5%), HUBZone (3%), and Service Disabled Veteran-Owned Businesses (3%).

Award

Municipal

$22,150,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,019
Active Projects
525
Bidding Soon
7,787
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 22, 2022

August 24, 2022

Project location map

To Be Determined, New York, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.