Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Early, Texas. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
Sequence of Constrution: The sequence of construction for the Ballpark improvements is as follows: Set signage Contact Texas811 to mark utility locations. Additionally, contact City of Early to locate irrigation features ahead of construction Install SWPPP devices according to plan Perform work according to plan including construction of sidewalks, drainage features, and associated parking upgrades Clean project site including finished pavement surface and remove SWPPP devices Concrete Sidewalks : Construct 4" or 6" thick concrete sidewalk according to Item 531 as called out in the plans. Sidewalk payment will be measured in place by square yard of surface area. Expansion joints should be placed at section lengths greater than 8 ft. but less than 20 ft. For large concrete surface areas on site layout sheets, contractor shall submit a joint layout plan for approval by the engineer. The maximum area allowable without a joint is 144 SF (12'x12'). All light fixtures, trees and utility fixtures are to remain in place with a minimum of 2' buffer around each feature to be filled with crushed rock. Movable benches shall be moved and re-set as needed to construct concrete pathways and pads. This work is subsidiary to installation of concrete work. Retaining Wall: Prior to placement of any retaining wall or concrete surface around edge of field contractor shall coordinate with the City of Early to allow for pole placement and backstop fixtures. Surface finish of retaining wall shall be rock type matched to Tee-ball field located within the ball park facility. Contractor to provide a concrete wall with brick ledge. Stone work to be completed by the City of Early. Retaining wall components feature both freestanding sections and backfilled sections according to grade around fill. Backfilled sections shall follow details provided for retaining wall to proposed ground tie-in points. Grading behind wall shall be flush with cap as to not impound water without drainage away from wall. Fixed stairs shall be constructed according to OSHA 1917.120. In areas around dugout contractor shall coordinate with City of Early for details regarding dugout construction. Above wall features, fencing, dugout furniture and misc. items are to be constructed by the City of Early as finish out of the dugout. Temporary Erosion, Sedimentation, and Environmental Controls: Installation of BM P's is mandatory prior to beginning construction. Materials shall not be stockpiled onsite without the approval of the City of Early. Sodding for this project shall be completed by the City of Early. Contractor shall prepare area for sodding with 2" topsoil free of debris suitable for sodding materials. Project Schedules: The anticipated project schedule for this project is approximately 60 working days from start to finish. Submit project schedule to the City of Early for review and approval. Demolition of field features will be performed by the City of Early. This includes dugouts to be reconstructed and backstops in place on certain fields. Care should be taken to preserve features to remain including field improvements and ongoing ballpark projects being constructed by the City of Early. Plan north limits of construction will tie into existing sidewalk/batting cage. Plan west limits of construction will end the sidewalk just past the entrance to the field past the dugout. City of Early will remove all bleachers and large rocks currently shown on plans. Contractor will be responsible for grading of subgrade to meet ADA and parking curb specs (6" curb the length of the parking area). See detail for stem wall from dugout to dugout at fields edge o If able, provide a bid alternate for labor to install rock to match existing fields. Rock for stem wall provided by the City of Early. Electrical by City of EarlyO o Grades shall match existing parking lot and adhere to ADA requirements moving deeper into the project. City of Early will haul off excess dirt from grading or provide fill if needed. Contractor shall provide and install all pavement marking, wheel stops and signage depicted on the plans. City of Early will backfill topsoil around sidewalk, contractor will be responsible for removing all forms and large debris created by the construction process. City of Early will be responsible for placement of grass sod and any irrigation deemed necessary. No trees shall be removed by the contractor. All questions shall be directed to: Larry McConn City of Early Assistant City Administrator: Director of Economic Development Office- 325-643-5451
Award
Sidewalks / Parking Lot
$48,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Plans. If Specifications become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 10, 2022
February 10, 2022
Multiple Locations, Early, TX
Related To This Project
Early, TX
Bid Date: Jan 17 2022
Early, TX
Bid Date: Mar 16 2022
Early, TX
Bid Date: Mar 16 2022
Early, TX
Bid Date: Jun 05 2020
Early, TX
Bid Date: Mar 16 2022
Early, TX
Bid Date: Apr 08 2022
Early, TX
Bid Date: Sep 29 2023
Early, TX
Bid Date: Dec 06 2023
Early, TX
Bid Date: Jan 06 2022
Early, TX
Bid Date: Jan 07 2022
Early, TX
Bid Date: Dec 29 2021
Early, TX
Bid Date: Jan 07 2022
Early, TX
Bid Date: Sep 28 2023
Early, TX
Bid Date: Sep 28 2023
Early, TX
Bid Date: Sep 07 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.