BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Denver, Colorado. Completed plans call for site work for a bridge / tunnel; playground / park / athletic field; and water / sewer project.

Est. Value Notes: Between $5,700,000 and $6,300,000 This project will construct the downstream end of the Tennessee & Oneida Storm System project, which will improve ponding and localized flooding at the sump in S. Oneida St just north of Tennessee Ave. This first phase of construction will remove and replace the outlet structure of Lollipop Lake in Garland Park, replace the culvert across Cherry Creek Drive North and rebuild the outfall into Cherry Creek. Phase 1 will also build the downstream end of a new storm system pipe network, which will outfall into Garland Park and convey stormwater runoff into Lollipop Lake via a graded and landscaped swale. The new stormdrain will come out onto S Kearney St and make the turn eastward onto Mississippi Ave, where the storm system improvements will terminate for Phase 1. Denver Parks will also make improvements around Lollipop Lake, which will include minor grading, landscaping and irrigation improvements. 13% MWBE PREQUALIFICATION REQUIREMENTS: Each bidder must be prequalified in category 1E(4) PIPED SEWER at or above the $9,000,000.00 monetary level. Deadline to Submit Questions: April 8, 2022 at 10:00 A.M., local time. Please submit questions to DOTI.Procurement@denvergov.org. Multiple Location Are Available In This Project SCOPE OF WORK A. The work shall consist of installation, monitoring and testing of compaction grouting within the limits indicated on the Drawings to meet the acceptance criteria presented in within these specifications. B. In connection with the compaction grouting program, as shown on the drawings, the grouting contractorshall provide all labor, materials and equipment as detailed in the contract documents and within the Measurement and Payment to accomplish the work: Between $5,700,000 and $6,300,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. PTN - PWWW2019-006

Bid Results

Playgrounds / Parks / Athletic Fields

$7,085,529.00

Public - City

Site Work

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
38
Bidding Soon
998
All Active Projects
419
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2022

June 27, 2022

img_map_placeholder

Multiple Locations, Denver, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.