BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Conroe, Texas. Completed plans call for site work for a water / sewer project.

Furnishing all material, equipment, labor and supervision necessary for completion of the following: WALDEN STORM SEWER OUTFALL PIPE REHABILITATION AND TELEVISING (PHASE 1 WORK) The major items of work include: Rehabilitation of multiple storm outfalls in Walden Subdivision using CIPP or Spiral Wound Pipe to line the inside of existing CMP piping. Includes cleaning, video inspection of storm pipes. No bid proposal may be withdrawn for a period of sixty (60) days after the bid opening date. OWNER reserves the right to reject any or all bids or to accept the bid deemed most advantageous to it. Specifications and Bid Documents are available via internet, at no cost, from www.CIVCASTUSA.com You are to complete the work within Seventy-Five (75) consecutive calendar days from the date of the NOTICE TO PROCEED. This project is for the rehabilitation of three storm outfall pipes (one as an alternate) in need of repair, and video inspection of seven storm outfall pipes that appear to be in good condition (as viewable at the storm manhole) within the Walden Development in the MUD 9 service area. The storm outfalls have been inspected and given a number for identification. Montgomery County MUD 9 (Owner) has authorized Bleyl Engineering (Engineer) to oversee the rehabilitation of various storm pipes within Walden that drain to Lake Conroe that were determined to be in poor condition or in critical areas between homes. The Lake elevation on the day of inspection, October 19, 2021, was 199.67. The following details are recommendations based on visual inspection and preliminary research completed by the Engineer. Contractor shall have access to the site to collect all necessary information prior to the bid to understand all requirements to complete the work. Alternative pipe rehabilitation methods may be used at the discretion of the contractor and as approved by the Engineer prior to the bid. All additional work items required as a result of alternative methods shall be considered incindental and be included in the unit price for each item on the bid. Change orders will not be accepted during construction that are related to work items that result from the use of alternative methods.

Post-Bid

Water / Sewer

$135,000.00

Public - County

Site Work

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
43
Bidding Soon
2,642
All Active Projects
900
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 18, 2022

February 17, 2022

img_map_placeholder

Multiple Locations, Conroe, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.