Published April 11, 2023 at 8:00 PM
Updated August 12, 2025
Site work for a water / sewer project in Hutto, Texas. Completed plans call for site work for a water / sewer project.
*As of May 9, 2022, a contractor has been awarded. This Project includes the following Work: Installation of a new principal spillway intake structure, conduit, and impact basin via open cut excavation. Removal of the existing intake structure, principal spillway conduit, and rock riprap-lined plunge pool. Reworking the downstream slope of the dam which experienced a shallow slope failure, including: removal of existing rock riprap used for stabilization, regrading the downstream slope, installing a toe drain system, installation of filter and bedding material on the slope, and replacement of the existing rock riprap. Removal of a 2-foot-tall concrete parapet wall, removal of old equipment, raising the dam 1-foot with compacted fill, installing a new flexible base access road on the crest of the dam. Please direct all questions related to the design of this Project to the Q&A Section. The deadline to ask questions is 1/20/2022 6:00:00 PM CST This Project includes the following Work: Installation of a new principal spillway intake structure, conduit, and impact basin via open cut excavation. Removal of the existing intake structure, principal spillway conduit, and rock ripraplined plunge pool. Reworking the downstream slope of the dam which experienced a shallow slope failure, including: removal of existing rock riprap used for stabilization, regrading the downstream slope, installing a toe drain system, installation of filter and bedding material on the slope, and replacement of the existing rock riprap. Removal of a 2-foot-tall concrete parapet wall, removal of old equipment, raising the dam 1-foot with compacted fill, installing a new flexible base access road on the crest of the dam. The Engineer's estimate for the Project is $1,800,000. The Project is to be substantially complete and ready for operation 38 weeks from Notice to Proceed. The Project is to be complete and eligible for final payment 7 weeks after the date of Substantial Completion.
Award
Water / Sewer
$2,235,921.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 26, 2022
March 28, 2022
1500 Co Rd 139, Hutto, TX
Related To This Project
Hutto, TX
Bid Date: Feb 23 2022
Hutto, TX
--
Hutto, TX
--
Hutto, TX
--
Hutto, TX
--
Hutto, TX
--
Hutto, TX
--
Hutto, TX
--
Hutto, TX
--
Hutto, TX
Bid Date: Sep 15 2021
Hutto, TX
--
Hutto, TX
--
Hutto, TX
--
Hutto, TX
Bid Date: May 13 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.