BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Hutto, Texas. Completed plans call for site work for a water / sewer project.

*As of May 9, 2022, a contractor has been awarded. This Project includes the following Work: Installation of a new principal spillway intake structure, conduit, and impact basin via open cut excavation. Removal of the existing intake structure, principal spillway conduit, and rock riprap-lined plunge pool. Reworking the downstream slope of the dam which experienced a shallow slope failure, including: removal of existing rock riprap used for stabilization, regrading the downstream slope, installing a toe drain system, installation of filter and bedding material on the slope, and replacement of the existing rock riprap. Removal of a 2-foot-tall concrete parapet wall, removal of old equipment, raising the dam 1-foot with compacted fill, installing a new flexible base access road on the crest of the dam. Please direct all questions related to the design of this Project to the Q&A Section. The deadline to ask questions is 1/20/2022 6:00:00 PM CST This Project includes the following Work: Installation of a new principal spillway intake structure, conduit, and impact basin via open cut excavation. Removal of the existing intake structure, principal spillway conduit, and rock ripraplined plunge pool. Reworking the downstream slope of the dam which experienced a shallow slope failure, including: removal of existing rock riprap used for stabilization, regrading the downstream slope, installing a toe drain system, installation of filter and bedding material on the slope, and replacement of the existing rock riprap. Removal of a 2-foot-tall concrete parapet wall, removal of old equipment, raising the dam 1-foot with compacted fill, installing a new flexible base access road on the crest of the dam. The Engineer's estimate for the Project is $1,800,000. The Project is to be substantially complete and ready for operation 38 weeks from Notice to Proceed. The Project is to be complete and eligible for final payment 7 weeks after the date of Substantial Completion.

Award

Water / Sewer

$2,235,921.00

Public - City

Site Work

60

26

3

7

Subscribe For Documents

105 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
38
Bidding Soon
2,316
All Active Projects
861
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.