BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 8, 2022 at 8:00 PM

Updated September 15, 2023

Renovation of a mixed-use development in Columbus, Ohio. Completed plans call for the renovation of a laboratory facility.

A. The Schedule Manager will prepare a Construction Progress Schedule for all work included under the scope of each Contract, in accordance with Subparagraph 4.3.2 of the General Conditions. 1. The Schedule Manager will schedule and conduct a Schedule Kick-Off Meeting. Contractors are required to attend. a. The Schedule Manager will prepare and furnish to all contractors a Master Activity Coding template, in hard copy and disk, defining the Responsibility Code, Work Area Code, Milestones, Phase Code, etc. for the Construction Progress Schedule, as outlined in this section. Contractors shall submit subsequent schedule requirements in accordance with the Master Activity Code template to achieve continuity in merging scheduling input. b. The Schedule Manager will prepare and distribute a schedule framework of proposed construction sequence to the Contractors. 2. The Schedule Manager will prepare and furnish a detailed schedule framework, in hard copy and disk, to the Contractors. a. Contractors shall utilize the detailed schedule framework to prepare their Construction Progress Schedule for their specific scope of work. b. The Schedule Manager will schedule and conduct a minimum of two Schedule Sequence Review Meetings with mandatory attendance by all Contractors to meet the Construction Progress Schedule submission requirement within 60 calendar days after the Notice to Proceed is issued.

Award

Laboratories

$598,365.00

Public - State/Provincial

Renovation

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
202
Active Projects
108
Bidding Soon
2,179
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.