Site work and new construction of a municipal facility in Wilkesboro, North Carolina. Working plans call for the construction of a municipal facility; and for site work for a municipal facility.
Project Overview The project consists of the construction of a 2,100 square foot public restroom and multipurpose facility in downtown Wilkesboro. The building will consist of (1) story plus an open mezzanine. The scope includes demolition and removal of existing concrete slabs on-site, as well as removal of existing pavers as indicated on landscape drawings for reuse on-site. The project is more clearly identified through the Design Drawings issued on 8 October, 2021, also provided with this RFP. The project Architect is Samsel Architects. We anticipate construction to start in March 2022 to be completed by July 2022. Preconstruction will involve working closely with the Owner and the design team to provide budget estimates, value engineering, and constructability reviews at key milestones Deadline for all RFP Questions 3 January 2022 Follow-Up Interviews 6 & 7 January 2022 (exact time TBD) Construction Manager Selection 10 January 2022 - Town Council Meeting Pre-Construction January 11 2022 - March 2022 Construction Start March 2022 Scope of Services - Preconstruction Construction Manager firm will be an active member of the project team attending and participating in project meetings and correspondence. Consult with and assist the team in accomplishing Owner's objectives and goals with respect to design, estimates, constructability, value analysis, bid packages and scheduling of the project. Preparation of detailed cost estimate. Generate cost savings suggestions and constructability issues for team evaluation. Generate guaranteed maximum price amendments on early procurement packages as needed with a final GMP at or near 100% construction documents. Provide additional cost savings and assist with any necessary reconciliation of GMP to the project budget. Lead the permit procurement. Provide project schedule. The project team anticipates utilizing an AIA A104-2017 and associated General Conditions form of agreement. Following a successful pre-construction effort and mutually agreeable GMP, it is the Owner's intent to move into construction with the contracting firm to execute the scope of work. Proposed Project Team Submit with your proposal an organization chart and associated resumes of the team you are committing to this project. Include at least the following: Pre-construction/Estimator, Project Manager and Superintendent. Please indicate that the commitment of the team is for the duration of the project. Project Budget & Schedule Based on the preliminary information shared along with the current design documents please provide a project budget estimate. Estimates should be conservative / realistic. Construction Manager selection will not be based on a "low estimate". Also at our interview, please provide how you would propose sequencing and durations in a high level project schedule. Fee and General Conditions Utilize the attached form to submit your proposed fee as a percentage of construction and proposed general conditions. Provide costs for Performance & Payment Bonds, Commercial General Liability, and Builders Risk in terms of cost per $1,000. Provide cost for subguard program, if applicable. Company Qualifications Include project details on three past projects completed by your firm that are most similar to this project. Please include project photos and images. Include associated references and contact information. List any scopes of work that you have the capability and would consider self-performing. Please comment on how you would propose achieving competitive pricing on self-perform scope.
Final Planning
Municipal
$150,000.00
Public - City
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 3, 2022
March 1, 2022
To Be Determined, Wilkesboro, NC
Related To This Project
Wilkesboro, NC
Bid Date: Mar 25 2022
Wilkesboro, NC
Bid Date: Dec 13 2023
Wilkesboro, NC
Bid Date: Nov 21 2023
Wilkesboro, NC
Bid Date: Jan 22 2024
Wilkesboro, NC
--
Wilkesboro, NC
--
Wilkesboro, NC
--
Wilkesboro, NC
--
Wilkesboro, NC
Bid Date: Aug 02 2021
Wilkesboro, NC
Bid Date: May 14 2024
Wilkesboro, NC
Bid Date: Sep 21 2023
Wilkesboro, NC
Bid Date: Sep 19 2023
Wilkesboro, NC
Bid Date: Jun 15 2023
Wilkesboro, NC
Bid Date: May 31 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.