BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Remodeling of a mixed-use development in Corpus Christi, Texas. Completed plans call for the remodel of a educational facility; and library.

Request for Proposal (RFP) method of procurement, Calallen Independent School District (the District) is soliciting Proposals from qualified vendors for Library Facility Remodel Services at the High School and Magee Intermediate facilities. Using the Request for Proposals (RFP) method of procurement, Calallen Independent School District (the District) is soliciting proposals from qualified vendors to provide for Library Facility Remodel Services. These services will be delivered at the High School and Magee intermediate campuses. Any and all offers tendered as a result of this procurement must be of equal or superior in quality to the specifications within this document. The Scope ofWork will consist ofremodeling various aspects ofthe library interior elements such as altering the floorplan, removal and installation of carpeting, installation oftile, interior wall paint, construction ofnew counter tops, and installation of additional electrical capacity as indicated within the specifications provided. CASEWORK 1. Remove and relocate floor mounted book casework as designated; 2. Remove sections of book casework to create shorter shelving unit as designated; 3. Construct new laminate tops for book casework and all interior countertops. Laminate will be equivalent to Wilsonart, Standard Laminate, Pearl Soapstone, Model # 4886-38, Fine Velvet Finish; 4. Remove existing computer counters from North wall adjacent to library entrance; 5. Remove approximately 30 linear feet ofwall mounted book shelves from East wall; 6. Relocate and permanently attach wall shelves to North wall adjacent to the library entrance; SPECIAL NOTE: Ifthe 30' ofEast wall shelves cannot be reused on the North wall, Contractor may provide Alternate pricing for the construction of new book cases to match; 7. Remove Existing counter on West wall adjacent to storage and replace with revised and lengthened counter top (Pearl Soapstone) to accommodate Maker Space rolling carts; ELECTRICAL EAST WALL 13. Install four (4) additional duplex electrical outlets for floor use on East wall. Ten (10) amps for each duplex. Use exterior conduit ifrequired and paint to match; 14. Install one (1) additional duplex electrical outlet on East wall with Ten (10) amp capacity for owner furnished wall mounted Flat Panel Display. Use exterior conduit ifrequiredand paint to match; 15. Install two (2) additional Cat 6e communications cables for wall mounted Flat Panel Display with exterior conduit and paint to match; 16. Install owner furnished Flat Panel Display where designated; 17. Owner to determine placement; FLOORING 8. Install owner furnished carpet squares under removed book casework as indicated; 9. Replace carpet squares with owner furnished laminate floor materials as required; 10. Assist the District in palletizing any excess flooring materials for storage; 11. Scope ofthe tile installation will be clarified during the site visit; 12. Replace and or install vinyl base cove as needed. Cove must be equivalent to TS Wallflowers Rubber (WF-078), TP Base 2000 (B2-078), TV Vinyl (VCB-078) at 1/8" The District is an Equal Opportunity employer. Historically Underutilized Businesses (HUB's) are encouraged to apply. All work at the High School must be completed by July 15, 2022. Magee Intermediate- All work must be completed by June 1, 2022 *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Post-Bid

Library

$150,000.00

Public - City

Remodeling

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
46
Active Projects
31
Bidding Soon
361
All Active Projects
160
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 3, 2022

March 7, 2022

July 15, 2022

img_map_placeholder

Multiple Locations, Corpus Christi, TX

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.