BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 14, 2024 at 8:00 PM

Updated March 15, 2024

Remodeling of a fire / police facility in Costa Mesa, California. Completed plans call for the remodel of a fire / police facility.

As of March 14, 2024, this project has not yet been awarded. A timeline for award has not yet been established. License Requirements CLASS B Liquidated Damages $1,900.00 per day Start/Delivery Date WITHIN 10 DAYS OF AWARD OF THE CONTRACT Project Duration 180 WORKING DAYS Online Q&A Yes Q&A Deadline 02/06/2024 5:00 PM (PST) The work includes site preparation, demolition of a portion of the existing asphalt pavement and its replacement with a combination of a new concrete slab on grade, new crew parking area, miscellaneous pavement, ADA accessibility improvements and treatment of the existing asphalt surface; an attached structure with decontamination showers and restrooms for training use; an underground water recovery system that reconfigures the existing storm drain system (with pumps), a solar panel system mounted over carports, the site preparation, footing excavation and layout of a structural footing along with the installation of an lighting electrical system for a prefabricated structure (tower pre-fabrication and installation done by others), and deferred solar panel submittals for the Building Department and Fire review, approval, and permits. Other Details The Contractor shall coordinate the installation of a prefabricated tower with WHP Training Towers TM. The general scope of work includes site and ground improvements, decontamination showers and restrooms, a water recirculation system, solar panel mounted on carports among other miscellaneous improvements to the training area, and site preparation and footing excavation for the prefabricated tower and stairs. 1. NEW PRE-FABRICATED FOUR-STORY WHP FIRE TRAINING TOWER (OWNER FURNISH, OWNER INSTALL, UNDER A SEPARATE PERMIT: BPCC-23-0116). 2. NEW UNDERGROUND WATER RECOVERY SYSTEM, NEW CREW PARKING AREA WITH CARPORT, AND SITE IMPROVEMENT. 3. REMODEL DIRTY TRAINING CLASSROOM BUILDING, WITH 1,264 S.F. ADDITION.

Bid Results

Fire / Police

$2,698,888.00

Public - City

Remodeling

142

28

90

6

Subscribe For Documents

48 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
598
Active Projects
297
Bidding Soon
4,040
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2024

April 17, 2024

Project location map

2300 Placentia Ave, Costa Mesa, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.