BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Remodeling of a fire / police facility in Costa Mesa, California. Completed plans call for the remodel of a fire / police facility.

As of March 14, 2024, this project has not yet been awarded. A timeline for award has not yet been established. License Requirements CLASS B Liquidated Damages $1,900.00 per day Start/Delivery Date WITHIN 10 DAYS OF AWARD OF THE CONTRACT Project Duration 180 WORKING DAYS Online Q&A Yes Q&A Deadline 02/06/2024 5:00 PM (PST) The work includes site preparation, demolition of a portion of the existing asphalt pavement and its replacement with a combination of a new concrete slab on grade, new crew parking area, miscellaneous pavement, ADA accessibility improvements and treatment of the existing asphalt surface; an attached structure with decontamination showers and restrooms for training use; an underground water recovery system that reconfigures the existing storm drain system (with pumps), a solar panel system mounted over carports, the site preparation, footing excavation and layout of a structural footing along with the installation of an lighting electrical system for a prefabricated structure (tower pre-fabrication and installation done by others), and deferred solar panel submittals for the Building Department and Fire review, approval, and permits. Other Details The Contractor shall coordinate the installation of a prefabricated tower with WHP Training Towers TM. The general scope of work includes site and ground improvements, decontamination showers and restrooms, a water recirculation system, solar panel mounted on carports among other miscellaneous improvements to the training area, and site preparation and footing excavation for the prefabricated tower and stairs. 1. NEW PRE-FABRICATED FOUR-STORY WHP FIRE TRAINING TOWER (OWNER FURNISH, OWNER INSTALL, UNDER A SEPARATE PERMIT: BPCC-23-0116). 2. NEW UNDERGROUND WATER RECOVERY SYSTEM, NEW CREW PARKING AREA WITH CARPORT, AND SITE IMPROVEMENT. 3. REMODEL DIRTY TRAINING CLASSROOM BUILDING, WITH 1,264 S.F. ADDITION.

Bid Results

Fire / Police

$2,698,888.00

Public - City

Remodeling

142

28

90

6

Subscribe For Documents

48 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
237
Active Projects
113
Bidding Soon
2,448
All Active Projects
1,089
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2024

April 17, 2024

img_map_placeholder

2300 Placentia Ave, Costa Mesa, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.