BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Elnora, Indiana. Completed plans call for the renovation of a educational facility.

**As of March 8, 2022 this project was awarded to Santarossa Mosaic and Tile. Awarded amount not established. All work for the complete construction of the Project will be under one Prime Contract with the Owner based on proposals received and awarded. All proposals shall include a price for the complete turnkey installation. The Contractor shall field verify all existing conditions and coordinate his work prior to submitting the proposal. o New Epoxy terrazzo floor finish in existing cafeteria and at south door opening into Kitchen as indicated herein. o Contractor shall provide all labor and materials required to install new epoxy terrazzo floor finish in cafeteria and at adjacent south entrance into Kitchen. Contractor shall purchase and install wall base. In addition, the Contractor is to provide all coordination with the Owner and Owner's Representative for conducting work, providing for safety around and to the work site, minimizing and repairing any damage or impact to existing building materials or systems due to construction activities at no cost to the Owner. Contractor is allowed to utilize the Owner's electricity, water, and sanitary facilities as necessary to carry out the project scope of work, and as coordinated with the Owner's Representative. Contractor is responsible for all costs to hire a qualified electrician to connect equipment power supply to Owner's existing electrical panels. Construction Trailers if necessary or storage containers/fenced-in lay-down space for construction materials is the responsibility of the Contractor and is to be coordinated with the Owner's Representative, and any damage to exterior site conditions must be restored to original condition at the end of the project at no cost to the Owner. Project Location: North Daviess Jr./Sr. High School, 5494 East State Road 58, Elnora, Indiana 47529 o On-Site Start Construction: June 1, 2022. o Project Complete: August 1, 2022 NO EXCEPTIONS

Award

Educational

$200,000.00

Public - County

Renovation

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
29
Bidding Soon
747
All Active Projects
294
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2022

June 1, 2022

img_map_placeholder

5494 E State Rd 58, Elnora, IN


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.