BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Remodeling of a municipal facility in La Grande, Oregon. Completed plans call for the remodel of a municipal facility.

The purpose of the ITB is to establish a Contract for La Grande Armory SIPR Room Upgrades for the benefit of Oregon Military Department (OMD). The Work contemplated under this Contract includes all labor, materials, transportation, equipment and services for, and incidental to, the completion of all construction Work in connection with the project described in the Contract Documents The following range is a project estimate for bonding purposes only: $65,000 to $75,000.00 LOCATION OF WORK: La Grande Armory 404 12th St. La Grande, Oregon 97850 Union County PROJECT START DATE: 15 calendar days from issuance of Notice to Proceed. SUBSTANTIAL COMPLETION: 120 calendar days from issuance of Notice to Proceed FINAL COMPLETION: 180 calendar days from issuance of Notice to Proceed The project upgrades existing SIPR room to meet the current security requirements. This will require demolition of current walls and ceiling. Add the necessary layers of materials to meet the current security requirements to the new walls and ceiling. All surfaces must be finished with primer and paint to match existing colors. Work to be performed shall include but will not be limited to the following: o Current walls and ceiling are to be removed in the existing SIPR room, room # 109. o Existing door and frame to be removed, current CDX combination lock Shall be disposed of per DoD Lock Program protocol. Instructions to be provided upon contract award. o Walls shall be reconstructed in room #109 as follows: A 5/8 inch-thick plywood layer shall be attached directly to the wall studs on the interior and covered with the layer of 5/8 inch thick wallboard. The plywood shall be continuously glued and screwed to the studs every 12 inches along the length of each stud and at the ceiling and floor. Ceiling construction to follow the same guidelines as the walls. o Walls and ceiling are to be insulated for sound attenuation to 30-45db. Acoustic fill and insulation shall be placed between the studs in a manner which prevents any slippage. o All walls and ceiling are to be finished and painted floor to ceiling to match existing finishes. o New Cove base to be installed after painting is completed, color to match existing cove base throughout the building. o HVAC penetrations shall not be larger than 96 square inches. o All current electrical in walls is to be extended to new finished wall surface. o Install dedicated 120V, 20amp circuit for Network cabinet. This additional electrical circuit shall be pulled in from room 122 and be in conduit its entire length with compression type connectors o Install metal fire door, 16 gauge, rated to UL 10-UL 10C-NFPA 252 standards for 3 hour rated at 650 degrees. Door and door seals shall provide correct level of sound attenuation to prevent conversations from being overheard on the exterior of the door/room. o Install New metal door frame and Jam with same fire rating as the door, welded metal. o Existing daylight window at existing door to be removed and wall infill as noted above with additional exterior 5/8 wall board. Exterior finish shall match the existing adjacent wall and paint shall blend to match existing wall with a seamless appearance. o Install CDX10 combination lock on the door. CDX-10 hardware configuration shall have an interior exit device and be of the same fire rating as the new door. DOJ Approved 7-27-22 Version ITB 200067C002 Page 46 of 49 o IDS detection Exterior annunciator shall be mounted on the exterior wall of the SIPR near the top of the door. o Surface mounted conduits with in the SIPR for IFR motion detector and balanced magnetic switches at the entry door. o IDS Equipment installation per the attached drawing and equipment list. o No openings in the ceiling or walls shall exceed 96 square inches and will have appropriate sound attenuation/baffling to prevent sound transfer through the opening. "All rights and remedies available to Owner under applicable federal, state and local laws are also incorporated by reference herein and are cumulative with all rights and remedies under the Contract."

Award

Municipal

$139,900.00

Public - Federal

Remodeling

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
4
Bidding Soon
97
All Active Projects
45
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 13, 2022

September 28, 2022

img_map_placeholder

404 12th St, La Grande, OR


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.