BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 21, 2021 at 7:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Fairfield, California. Contact the soliciting agency for additional information.

Caltrans is soliciting Statements of Qualifications (SOQs) from qualified firms that may lead to the award of a contract for A&E On-Call Independent Cost Estimator (ICE) and Construction Scheduler related to Project Development and Construction Services. 18% DBE Participation Goal Required. Questions concerning this Request for Qualifications (RFQ) must be submitted in writing to the attention of Araya Rabidoux at araya.rabidoux@dot.ca.gov. Questions must be received no later than seven (7) business days after the RFQ advertisement. The estimated contract is $600,000 - $975,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Federal and/or State prevailing wage rates may apply The estimated contract term is two and a half (2.5) years. The scheduled date to complete cost negotiations and submit final cost proposal is March 22, 2022. The method of Contractor Selection has not been Determined at this time.

Conceptual

Roads / Highways

$975,000.00

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
429
Active Projects
155
Bidding Soon
3,240
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 19, 2022

Project location map

Multiple Locations, Fairfield, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.