BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Hastings on Hudson, New York. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

No laborer, worker or mechanic in the employ of a contractor or subcontractor engaged in the performance of any public work project shall be permitted to work more than eight hours in any day or more than five days in any week, except in cases of extraordinary emergency. The work must be performed between 7:30 a.m. and 4:30 p.m. Monday through Friday. Any exceptions out of these hours must have prior approval by the Department Head in charge of the public work project. The wages and supplements to be paid and/or provided to laborers, workers and mechanics employed in a public work project shall not be less than those listed in the current Prevailing Rate Schedule for the locality where the work is performed. The prime contractor shall obtain a Prevailing Rate Schedule from the: New York State Department of Labor, Bureau of Pubic Work, Sate Office Campus, Bldg. 12, Albany, NY 12240. The prime contractor must provide copies of this schedule to all subcontractors and obtain an affidavit certifying such schedule was received. DESCRIPTION OF PROPOSAL: The Village of Hastings-on-Hudson, New York (the "Village") is requesting a proposal to construct concrete sidewalks, stamped concrete, concrete haunch, resetting granite curb, filling voids beneath existing sidewalk with concrete, rip rap and resetting fence along the Hastings-onHudson Metro-North Railroad Station located on Southside Avenue. Other related work shall include removal of eroded debris and materials, and trees. Coordination with the Metro-North Railroad is required and expected throughout the duration of the work. PROPOSED WORK: The proposed work includes removing existing concrete sidewalks, stamped concrete, eroded debris, materials and trees, and preparing the area for low-carbon concrete sidewalks, stamped concrete, concrete haunch, resetting granite curbs and fencing as shown on the plans. Additional work includes filling voids beneath existing sidewalk with low-carbon concrete, rip rap stabilization, cleaning, and restoring the area of construction. The Contractor is responsible to become familiar with the site and to verify all field measurements and conditions.

Post-Bid

Sidewalks / Parking Lot

$100,000.00

Public - City

Paving, Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
509
Active Projects
300
Bidding Soon
4,546
All Active Projects
2,045
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 12, 2022

February 11, 2022

img_map_placeholder

Southside Ave, Hastings on Hudson, NY

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.