BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a transportation facility in Connersville, Indiana. Completed plans call civil work for a runway / taxiway.

Project no-C.EN.100694.1277, 60614761.COI.GEO The scope of work includes: Concrete. Earthwork, Misc Metals - Hand Rails, Signage, Helical Piles, Shoring, Electrical. A. PROVIDE NEW 8" HIGH TOP OF RAIL PLATFORM WITH RAMP FROM ACCESSIBLE PATH OF TRAVEL. B. RELOCATE EXISTING WHEELCHAIR LIFT ENCLOSURE TO NEW PLATFORM. C. SALVAGE EXISTING SIGNAGE AS NOTED AND PROVIDE NEW SIGNAGE AS REQUIRED BY 2006 DOTAS AND AMTRAK SIGNAGE STANDARDS. D. NEW ADA RAMPS FROM PARKING TO 8" HIGH TOP OF RAIL PLATFORM E. NEW PLATFORM LIGHTING ALONG THE FULL LENGTH OF NEW PLATFORM 1. The Work consists of constructing and/or renovating portions of an existing station served by Amtrak. The Work typically includes, but is not limited to improvements to the site, station, associated platforms, pathways and parking areas as described in the Contract Documents. 2. The Work shall bring the station into full compliance with the 2006 Department of Transportation Accessibility Standards; Amtrak's ADA Guidelines; ADA Accessibility Guidelines; applicable state and local codes. 3. The station will remain in operation during construction; disconnection of utilities for the Work shall not impact the rest of the station. 4. The station and platform are in active use and cannot be closed for construction. The General Contractor is responsible for creating an appropriate phasing and staging plan for the Work and for coordinating all construction activities with the Amtrak, COTR, and the adjacent freight or commuter railroad (the Host Railroad). 5. On-site construction laydown areas are limited. Laydown areas are to be approved by the COTR prior to laydown and if space is available. 6. Phase activities for proper execution of the Work. All coordination with Amtrak's operations and occupancy requirements must go through the COTR. Provide detailed phasing plans for all work activities for review and approval by the COTR and Amtrak. The Construction Schedule shall indicate the Work included in each phase. 7. Refer to Section 1.5 PHASED CONSTRUCTION, for additional information.

Post-Bid

Transportation Terminals

$1,200,000.00

Public - Federal

New Construction, Site Work

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
62
Bidding Soon
1,190
All Active Projects
478
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 10, 2022

March 11, 2022

img_map_placeholder

1012 N Eastern Ave, Connersville, IN

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.