Published April 15, 2022 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Inver Grove Heights, Minnesota. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; road / highway; and road / highway.

As of April 15, 2022, the project has been awarded and construction has commenced, however, construction is currently on hold until weather is more consistently appropriate. Site Directions: Traveling north on Cahill Avenue, head north of 70th Street and turn right onto Carleda Way and enter the project area. No pre-bid meeting will be held. Approximate quantities of major items of work are as follows: Clearing and Grubbing 16 TREE, 0.5 ACRE Remove Manhole/Catch Basin 30 EA Remove Bituminous Pavement 6,250 SY Remove Driveway Pavement 800 SY Remove Sewer/Water/Storm Pipe 4,200 LF Common Excavation 9,600 CY Aggregate Base Class 5 2,600 TON Select Granular Embankment 4,900 CY Bituminous Pavement 1,550 TON RC Pipe Culvert (15" - 30") 1,450 LF Drainage Structure (48" - 72") 23 EA Sanitary Sewer Manhole 12 EA 8" PVC Sewer 1,400 LF 8" DIP Watermain 1,600 LF Temporary Water Service 1 LS Concrete Curb and Gutter 3450 LF Concrete Driveway 250 SY Seeding (Hydroseed) 2.5 ACRE Boulevard Topsoil Borrow 1,000 CY Silt Fence/Sediment Control Log 1,200 LF Deciduous/Coniferous Tree 10 EA Deciduous Shrub 89 SHRUB

Under Construction

Roads / Highways

$1,522,714.00

Public - City

Paving, Site Work

63

13

17

6

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Vehicular Access and Parking, Traffic Control, Temporary Controls, Temporary Erosion and Sediment Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Site Maintenance, Closeout Submittals, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment
Division 08 - Openings

Division 08 - Openings

Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Signage, Storage Specialties, Postal Specialties
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Sodding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Service Connections, Water Utility Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
70
Bidding Soon
984
All Active Projects
371
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 25, 2022

April 4, 2022

img_map_placeholder

Multiple Locations, Inver Grove Heights, MN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.