Published February 24, 2022 at 7:00 PM

Updated January 26, 2024

Site work, paving, new construction and renovation of a mixed-use development in Dickeyville, Wisconsin. Completed plans call for the construction of a water / sewer project; for the renovation of a water / sewer project; for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Description of Work: the project consists of a new chemical building, installation of a new positive displacement rotary lobe sludge pump, submersible scum and return activated sludge pumps, construction of a new sludge storage tank, a new effluent monitoring structure, piping, site improvements including fencing and paving, plumbing, HVAC, electrical, and SCADA improvements. PSI Project No.: 00522827-R1 The anticipated substantial completion date is November 30, 2022 and final completion date is December 31, 2022. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. BIDDER is required to deliver the original certified check or bid bond within the 72 hours of bid opening to MSA Professional Services, Inc., Attn: Matt Castillo, 1702 Pankratz Street, Madison, WI 53704. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. Pre-Qualification: Yes This project anticipates use of Wisconsin DNR Clean Water Fund Program funding. We encourage Disadvantaged Business Enterprises (DBEs), including Minority-owned Business Enterprises (MBEs), and Women's Business Enterprises (WBEs) to submit bid proposals. A municipality, in awarding prime contracts, and the primary engineer and primary contractor, in awarding subcontractors, are required to make a good faith effort to achieve a combined minimum goal of 15% participation for MBE/WBE utilization in accordance with s.NR 162.09(3), s.NR 166.12(4), and s.NR 167.18(4) Wis. Admin. Code. If a subcontractor awards subcontracts, these requirements shall apply to the subcontractor. OWNER reserves the right to waive any informalities or to reject any or all bids.

Award

Water / Sewer

$2,121,016.00

Public - City

New Construction, Paving, Renovation, Site Work

88

30

5

12

Subscribe For Documents

50 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
152
Active Projects
72
Bidding Soon
1,057
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.