BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a library in Urbana, Illinois. Completed plans call for the demolition of a library.

The Urbana Free Library is accepting bids for demolition of the Webber Building at 201 West Green Street, Urbana, Illinois 61801. Bidders must comply with the City of Urbana's EEO Contract Compliance Program. Contact the City of Urbana Human Relations Division at 400 South Vine St, Urbana, Illinois 61802 (217) 384-2466. Contractor and subcontractors are required to pay prevailing wages as determined by the Illinois Department of Labor, Prevailing Wage Act-2021 Champaign County-Prevailing Wage Rates If you have any questions about the project, please contact: Mike Hannan, Facilities Manager, The Urbana Free Library, 210 West Green Street, Urbana, Illinois 61801 (217) 531-7080, mhannan@urbanafree.org. The contractor shall remove the structure, shrubs, trees, vegetation and root systems between the building and the public sidewalk on the north and east sides of the building and remove the structure, shrubs, trees, vegetation and root systems between the building and the driveway to the west and the building and the parking lot to the south. The contractor shall remove all sub-grade foundation systems/materials and any other items discovered during the demolition process including removing root systems a minimum of 2 feet below finish grade. The contractor shall be responsible for contacting the Utility companies and terminating and capping all utility service to the building. Contractor is responsible for reclamation of any condensing unit refrigerant, disposal of condensing units and compressors proper disposal of roofing and building materials in accordance with State law or City of Urbana ordinances. Any items left on site when demolition begins, becomes the property of the contractor and may dispose or reuse as they see fit. The perimeter area of demolition shall be fenced to prevent access to the demolition site when work is not being undertaken. North Side of building-The contractor shall remove all trees, bushes and vegetation, concrete steps and south to the building and the concrete retaining wall, next to the City sidewalk. West side of building-remove any debris and vegetation next to the curb cut. South side of building-remove any debris and vegetation between building and parking area. East side of building-remove any debris, sidewalk to door and vegetation between building and City sidewalk.

Post-Bid

Library

$30,000.00

Public - City

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
29
Bidding Soon
488
All Active Projects
238
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 28, 2022

February 28, 2022

img_map_placeholder

201 W Green St, Urbana, IL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.