BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a library in Agawam, Massachusetts. Completed plans call for the renovation of a library.

The Agawam Public Library Chiller Replacement Estimated Cost $180,000 Work includes but is not limited to the following: 1. ELECTRICAL, SEC 08 00 00: a. Make safe, and disconnect existing power to the existing exterior chillers. Remove disconnects and associated wiring and accessories as required back to interior switchgear in Library Electric Room at panel as per plans and specifications. b. Test & verify condition of existing conductors & conduit from panel to units. Re-use unless fauls found and approved by Director of Building Maintenance. c. Furnish and install new disconnects, accessories, and all required equipment, and re-connect to new chillers from switch gear within the Library electric room panel as per the plans and specifications. d. Test and verify with the HVAC contractor. e. All contractors shall work in harmony with all other trades. 2. HVAC SEC. 23 00 00: a. Make safe, disconnect, remove and legally dispose of the existing exterior chillers, chilled water piping, exterior pipe insulation, controls and all other accessories associated with the existing chillers as shown on the plans and specifications. b. Remove all existing tie-downs and existing attachments for the old chillers from the area and concrete pads. c. Furnish and install new tie-downs and hardware as per the manufacturer's written instructions for attachment to the existing pads provided by the Town of Agawam. d. Furnish and install new chillers, chilled water piping, exterior pipe insulation and all other accessories associated with the new chillers as shown on the plans and specifications, manufacturer's written instructions and as required for operation of the chillers on the existing pads. e. Electrical connections will be completed by Section 26 00 00 - ELECTRICAL. f. Additional controls shall be completed by Siemens Controls under a separate contract. g. All contractors shall work in harmony with all other trades. h. All other connections shall be part of this Section 23 00 00 HVAC Contractor's responsibility

Award

Library

$148,000.00

Public - City

Renovation

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
386
Active Projects
221
Bidding Soon
3,362
All Active Projects
1,507
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 7, 2022

February 7, 2022

img_map_placeholder

750 Cooper St, Agawam, MA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.