BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Graham, North Carolina. Completed plans call for site work for a water / sewer project.

The proposed work is generally described as follows: The project includes the installation of approximately 1,600 LF of 8" DIP/PVC Sanitary Sewer, 6 sanitary sewer manholes, 19 sanitary sewer services, and the abandonment of existing 8" and 6" sanitary sewer and manholes. The project also includes an alternate for the installation of approximately 275 LF of 6" C900 PVC Water Main, 160 LF 2" Sch. 80 PVC Water Main, and 11 water services. A second alternate is also included for the installation of approximately 225 LF of RCP/HDPE Storm sewer and 6 Storm Sewer Structures. Bidders must be licensed contractors in the State of North Carolina, duly licensed accordingly for the appropriate section of Bid. A 5% Bid security must accompany each Bid. Each Successful Bidder will be required to furnish a Construction Performance Bond and a Construction Payment Bond as security for the faithful performance and the payment of all bids and obligations arising from the performance of the Contract. No Bidder may withdraw his bid within 120 days after the actual date of the opening thereof. The City reserves the right to reject any or all bids and to waive informalities. Base Bid - Minimum work included in this project i. Sanitary Sewer Improvements 1. 545 LF 8" PVC 2. 1,060 LF 8" DIP 3. 19 service installations & connections ii. Sanitary Sewer Alignment 1. Albright Avenue a. Connection to existing manhole along N. Melville Street b. Installation of new alignment along N. Melville Street and Albright Avenue c. Dig and replace existing alignment along outfall d. Sewer services along Albright Avenue to be connected to new sewer alignment (locations to be verified by contractor) 2. Long Avenue a. New Alignment along Long Avenue, connecting to existing outfall alignment being replaced b. Existing gas located on south edge of pavement c. Existing water located center/northern section of pavement d. Sewer services along Long Avenue to be connected to new sewer alignment (locations to be verified by contractor) iii. Sanitary Sewer Abandonment 1. All existing infrastructure not being dug and replace will be abandoned a. Existing sewer mains to be filled with flowable fill b. Existing inverts to be plugged c. Existing manholes to have ring and covers removed and backfilled with approved material d. Existing stream crossing to be removed iv. Erosion Control 1. Silt Fence 2. Temporary Construction Entrance 3. 20' wide limit of disturbance within stream crossing buffers

Award

Water / Sewer

$956,937.00

Public - City

Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
207
Active Projects
125
Bidding Soon
1,914
All Active Projects
820
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 23, 2022

March 31, 2022

July 23, 2022

img_map_placeholder

Multiple Locations, Graham, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.