BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Minnetonka Mills, Minnesota. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of March 23, 2022, the project has been awarded. A timeline for construction has not been confirmed. Bridge (Replacement or Rehabilitation), Pavement - Marking, Aggregate, Sidewalks/Curbs/Gutters, Grade, Surface and Bridge, Fencing/Guardrails/Handrails, Grade and Surface, Traffic Control, Pavement Removal, Excavation, Landscaping - Seeding, Paving (Asphalt or Concrete), Guardrails/Attenuators/End Treatments, Sewer and Water Construction, Sitework/Excavating and Grading, Curbs, Signage, Bridges/Overpasses, Paving (Highway, Road or Street) The furnishing of all labor, material and equipment for construction of the following approximate major quantities: Remove Bituminous Pavement 6,500 SQ YD Remove Guardrail - Plate Beam 700 LIN FT Excavation - Common/Subgrade 4,000 CU YD Select Granular Embankment (CV) 3,200 CU YD Aggregate Base (CV) CL 5 1,900 CU YD Type SP 12.5 Wearing Course Mix (3,C) 2,300 TON Ornamental Metal Railing Type Special 580 LIN FT Prefabricated Modular Block Wall 3,100 SQ FT Arch Surface Finish (Multi-Color) 3,100 SQ FT 15" - 48" RC Pipe Sewer 940 LIN FT 10" PVC Pipe Sewer 500 LIN FT 20" Steel casing Pipe 250 LIN FT 6" - 12" Watermain Ductile Iron CL 52 1,000 LIN FT 3" Bituminous Walk 13,400 SQ FT Concrete Curb and Gutter 3,340 LIN FT Traffic Barrier Design Type 31 and Transition 250 LIN FT Impact Attenuator 1 ASSEMBLY Traffic Control 1 LUMP SUM Sign Panels Type C 150 SQ FT Seeding 2.3 ACRE 4" Broken Line Multi Comp GR IN 400 LIN FT Bridge Slab Concrete (3YHPC-M) 4,000 SQ FT Remove Existing Bridge 3 LUMP SUM Each proposal must have with it a certified check or bid bond payable to the City of Minnetonka in the amount of 5% of the bid as a guarantee the bidder will enter into a contract with the City of Minnetonka in accordance with the terms of the bid, in case the bidder is awarded the contract. Direct inquiries to Engineer's Project Manager, Nicholas Hentges at 763.287.8523 or nhentges@wsbeng.com. No questions will be answered within 48 hours of bid opening. The City reserves the right to accept or reject any or all bids and to waive minor irregularities SAP 142-148-007, 142-594-001, 142-594-002 WSB PROJECT NO. 018808-000 Construction operations shall be started on or before April 18, 2022 Completion- on or before October 20, 2023 *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Award

Bridges / Tunnels

$4,795,475.00

Public - City

Paving, Site Work

219

10

3

9

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
84
Bidding Soon
787
All Active Projects
318
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2022

April 18, 2022

img_map_placeholder

Opus Pkwy, Minnetonka Mills, MN

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.