BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Omaha, Nebraska. Completed plans call for site work for a playground / park / athletic field.

General Contractor shall self-perform with its own workforce a minimum of thirty percent (30%) of the total cost of the Contract. Purchasing of materials does not qualify as self performing the Work. A. The Contractor shall provide all materials, equipment, labor and apparatus necessary for the purchase and installation of the spray ground as shown on the drawings and as specified herein. B. The Contractor shall be responsible for winterizing the spray ground system for the first Winter after installation and starting up the system the following Spring. A. The Contractor shall provide all materials, equipment, labor and apparatus necessary for the purchase and installation of a steel picnic shelter, complete and painted with a concrete slab floor as shown on the drawings and as specified herein. B. Shelter shall be pre-cut, pre-fabricated package that includes: structural frame, roof deck system, fasteners, trim and installation instructions. Shelter shall have a clear span without center columns or open knee bracing Excavation, filling, furnishing additional fill if required, compaction and/or disposal off site of all sand, clay, gravel, broken stone, limestone, soft shale, soft slate or sandstone, loose or decomposed rock, boulders of less than one cubic yard in volume and all other material necessarily excavated and not otherwise classified under this Specification Work under this section shall consist of the preparation and placement of exterior portland cement concrete for all concrete site improvements including, but not limited to concrete walk pavement, concrete trail pavement; roadways, parking lots, curbing, combination curb and gutter, basketball court concrete pavement, handicapped curb ramps, concrete pavement under playground surfacing, concrete shelter pavement, heavy duty concrete pavement on the prepared subgrade, etc. where located and as detailed on the plans A. The Contractor shall furnish and install complete vinyl coated chain link fencing as detailed and where located on the plans including chain link fence, framework, gates and fittings. B. All fence components shall be thermally fused, polyvinyl chloride (PVC) over galvanize unless otherwise noted. This project has an SEB reserve for ESB and SB Tier 1 & 2 categories for 10% of the total bid amount. For additional information see Specification Section 00 20 00, 'Instructions to Bidders", Part 2.16, "Utilization of Small and Emerging Small Business". There will NOT be a pre-bid meeting. This project does not require the bidder to submit an Economic Equity and Inclusion Program (EEIP) Plan or an approved EEIP Certificate with their bid. As evidence of good faith and guarantee that cohttps://crm.bidclerk.com/project/attachments/5646535.htmlntract will be entered into should award be made thereon, a bid bond or certified check in the amount of 5% of the bid must accompany bid. The bid bond or certified check shall be made payable to the "City of Omaha". Failure to do so will be cause for rejection. City reserves the right to accept or reject any or all bids in whole or in part, and the bidders shall have the right to appeal any decision to the City Council.

Award

Playgrounds / Parks / Athletic Fields

$398,000.00

Public - City

Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
71
Bidding Soon
869
All Active Projects
365
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 26, 2022

February 25, 2022

July 31, 2022

img_map_placeholder

3104 Jefferson St, Omaha, NE


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.