Renovation of a water / sewer project in Garden Grove, California. Completed plans call for the renovation of a water / sewer project.

The SCADA Master Plan Implementation FP2-Pressure Monitoring Improvements Project consists of furnishing all labor, materials, tools, equipment, and incidentals necessary for the complete construction and installation of six pressure monitoring stations. Process control strategy implementation, including PLC programming and SCADA configuration, is not included in the Contractor's scope of work. The project consists of installing a new pressure monitoring station, including an electrical enclosure and a pressure transmitter enclosure. An equipment pad will be furnished for the two enclosures. The pressure transmitter's water line will be connected to an existing angle stop. The electrical enclosure will be provided with a new SCE electrical service. Conduit and wiring will be routed between the electrical enclosure and the pressure transmitter enclosure, as well as from the electrical enclosure to the nearest SCE pole. Once work is complete, the installation will be inspected and tested, in coordination with City staff. Direct ANY and ALL questions to Ms. Rebecca Li, Project Manager, (714) 741-5562.

Bid Results

Water / Sewer

$419,180.00

Public - City

Renovation

18

16

2

3

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Closeout Submittals, Bonds, Spare Parts
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, Painting
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Other Conveying Equipment, Facility Chutes
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Piping and Pumps, Facility Storm Drainage, Sump Pumps
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Switchboards and Panelboards, Panelboards, Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
212
Active Projects
110
Bidding Soon
2,435
All Active Projects
1,091
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2022

May 2, 2022

img_map_placeholder

To Be Determined, Garden Grove, CA


Find. Bid. Win. Your Next Project Starts Here.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

SCADA Master Plan Implementation FP2 - Pressure Monitoring Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.