BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Modesto, California. Working plans call for site work for a water / sewer project.

As of February 2, 2022, the project did not received bids. Stanislaus County Public Works is now accepting bids for the Crows Landing Industrial Business Park Well No. 1 Project. Estimated Construction cost for this project is less than $555,000. The work to be accomplished includes: Well Drilling and Construction of Crows Landing Industrial Business Park (CLIBP) Well No. 1 and Well Rehabilitation of Crows Landing Community Services District (CLCSD) Well No. 4. Wok shall include, but is not limited to well drilling, testing and disposal of drill cuttings and fluids, compliance with discharge requirements, geophysical surveys, removal and evaluation of pump equipment, pump installation and testing, aquifer testing, well disinfection, borehole drilling, installation of blank well casing, well development by airlifting and swabbing and pumping and surging, capping well casing and ancillary tubing, and site cleanup and restoration. Last Day Contractors Clarification Requests: January 12, 2022 Issuance of Addendum (if required): January 14, 2022 Bid Bond 10.00% Payment Bond Work includes furnishing products, labor, tools, transportation, and services including but not limited to: 1. Rehabilitation of the Crows Landing Community Services District (CLCSD) Well No. 4. 2. Construction, development and testing of one (1) new potable water supply well, the Crows Landing Industrial Business Park (CLIBP) Well No. 1 The rehabilitation of the CLCSD Well No. 4, including removal of existing pumping equipment, removal of sediment fill to total well depth, conducting a downhole video survey, swab-airlift well development, test pump well development, well testing, and installation of the original pumping equipment. 2. The construction, development and testing of one (1) potable water supply well, CLIBPWell No. 1, with a design capacity of 350 gallons per minute (gpm), including but not limited to site preparation, conductor casing and sanitary seal, borehole drilling, geophysical logging, borehole reaming, caliper survey, casing installation, gravel envelope placement, transition and annular seal placement, well development and testing, disinfection, and/or other work as necessary to complete the project as described in the Contract Drawings and Specifications. 100.00% Performance Bond 100.00% Estimated Bid Value 555,000

Final Planning

Water / Sewer

$555,000.00

Public - County

Site Work

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
158
Active Projects
92
Bidding Soon
1,789
All Active Projects
697
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 19, 2022

August 2, 2022

img_map_placeholder

Multiple Locations, Modesto, CA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.