BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, new construction and renovation of a fire / police facility in Pinellas Park, Florida. Working plans call for the construction of a fire / police facility; for site work for a fire / police facility; and for the renovation of a fire / police facility.

As of May 8, 2023, an architect and construction manager at risk has been selected. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: This project entails the design, construction, renovation, and any/all necessary permitting to build the new City of Pinellas Park Police Station and renovation of the existing Police Station. The City will hire a Construction Manager at Risk (CMAR) via Request for Qualifications (RFQ) first, and will then advertise a RFQ for Architect/Engineer services. The CMAR will advise the Architect/Engineer RFQ Selection Committee. The City will follow all applicable rules, regulations, and statutes to confirm an Architect/Engineer for use by the Owner and CMAR during the time of the project. Upon approval of an Architect/Engineer firm, the City, the CMAR, and the Architect/Engineer firm will work together closely to ascertain a mutually acceptable design concept. The CMAR and the Architect/Engineer firm will draw construction plans within the City's budget. This project will consist of two (2) phases: 1) Design and construction of a new Police Station including design and construction of a HVAC chiller system in the proposed project plus future buildings. 2) Design and reconstruction of the existing Police Station into a new Fire Station on the first floor and administrative offices on the above floors. The City of Pinellas Park is soliciting replies from firms to provide a full range of services as Construction Managerat Risk (CMAR) during planning, design, renovation, and construction ofthe Public Safety Campus. The Public Safety Campus consists of approximately two (2) acres for the new police station, with the balance of the work within the footprint of the existing police station, or as drawn plans dictate. Onsite CMAR services will begin after contract acceptance. With the assistance of the CMAR, the City will retain an Architectural/Engineering firm to provide all architecturally related services and construction document preparation. The CMAR will be required to work with the City and Architects during the planning phase and the construction process. All work is to be performed on an existing City site in multiple phases. Phase 1 of construction project is anticipated to occur in the spring of 2022 and continue through . The project will incur down time between , with renovations of the existing police station occurring afterward. All work will first be performed in the field north of the current Police Station for construction of the new Police Station. Phase 2 of the project, subsequent renovations of the existing Police Station, will consist of remodeling the 1st floor of the existing Police Station into a Fire Station, with Fire Administration offices in the above floors. The project will resume Phase 2 and run through the duration of renovations, with anticipated completion in . The scope of work includes parking lot, roadway construction, stormwater retention areas, and building construction and renovations. Some items currently in use may be reallocated. Concurrent to construction, the design and construction of a HVAC chiller system for air conditioning within the proposed project capable of expansion to include additional buildings.

Pre-Construction/Negotiated

Fire / Police

$23,750,000.00

Public - City

New Construction, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
287
Active Projects
122
Bidding Soon
2,200
All Active Projects
855
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 27, 2022

October 2, 2023

img_map_placeholder

7700 59th St, Pinellas Park, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.