BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a playground / park / athletic field in Santa Barbara, California. Completed plans call for the renovation of a playground / park / athletic field.

PN - 051-3410-001 Scope includes removing and replacing all visible framing including, sheeting, perimeter skirting, benches and handrail/guardrails. The Project is located at 600 W Junipero St, Santa Barbara and is described as follows: The purpose of this project is to restore approximately 2,800 square feet of the Oak Park Dance Floor space. Scope includes removing and replacing all visible framing including, sheeting, perimeter skirting, benches and handrail/guardrails. Q&A Deadline 01/12/2022 12:00 PM (PST) Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Liquidated Damages $200 per day Start/Delivery Date City anticipates work will begin on or about second week of February Project Duration The Project must be completed within 45 calendar days from the start date set forth in the Notice to Proceed License Requirements General B A pre-bid conference will not be held. Contractor to visit site at 600 W. Junipero for the purpose of acquainting all prospective bidders with the Contract Documents and the Worksite. The dance floor is outside. The purpose of this project is to restore approximately 2,800 square feet of the Oak Park Dance Floor space. Scope includes removing and replacing all visible framing including, sheeting, perimeter skirting, benches and handrail/guardrails. Once exposed, supporting lumber will be evaluated for damage, and replaced as needed. Door to storage (at stone wall) will also be removed and replaced in-kind. To aid water run-off, the new dance surface will have a 1% pitch with the ridge running from West to East. All plywood seams and hardware penetrations will be sealed with an epoxy sealer before the entire surface is waterproofed to match existing color. The perimeter of the new floor will include a drip edge to protect the new skirting from water run-off. Benches will be replaced and secured to the perimeter fencing and cantilevered with steel armature to minimize standing water. Dance floor, stair fascia and ramp past and handrails will be replaced in kind. All new wood to be coated with a full body stain to match existing

Award

Playgrounds / Parks / Athletic Fields

$96,000.00

Public - City

Renovation

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
28
Bidding Soon
466
All Active Projects
185
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 19, 2022

February 24, 2022

img_map_placeholder

600 W Junipero St, Santa Barbara, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.