BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Miami Shores, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Counties: Miami-dade Road Name : Sr 932/nw 103 St/w 49th St Limits : From W 3rd Ave to E 10th Ave and at Lejeune/e 8th Ave Project(s): 43476835201(*) Federal Aid No: D621021B Project(s): 43476835602 Federal Aid No: N/A Project(s): 43476845201 Federal Aid No: D621022B Total Roadway Length: 1.631 Miles Contract Days: 300 Total Bridge Length: 0.000 Miles Total Proposal Length: 1.631 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 120 Calendar Days The improvements under this contract consist of resurfacing and intersection improvements along SR 932/ NW 103 St./W 49th St. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 025 Resurfacing and Intersection Improvements Along SR 932

Award

Roads / Highways

$3,487,287.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
64
Bidding Soon
1,105
All Active Projects
433
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 26, 2022

March 28, 2022

img_map_placeholder

FL-932, Miami Shores, FL


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.