BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Davis, California. Completed plans call for site work for a playground / park / athletic field.

** As of July 5, 2024 , this project has not yet been awarded. The project is expected to be awarded on July 10, 2024.** The work shall include installing a splash pad at the north side of Central Park, north of the existing carousel and west of the existing tot lot playground, removing and replacing concrete panels on the south side of the park where the old splash pad used to be, and installing a new drainage system under the great lawn. The splash pad feature will include an underground holding tank, a small pump station including chlorine injection, fencing, and new picnic tables west of the carousel in accordance with the intent of the Project Plans and Specifications. All work shall be performed in accordance with the City of Davis Standard Specifications January 1996 Edition, Addenda through September 2021, General Prevailing Wage Rate, Labor Surcharge and Equipment Rental Rates, and the Contact Documents. The Project is funded partially by grant funds from a California Station Proposition 68 Grant. Accordingly, all Grant Requirements set forth in the Contract Documents must be complied with. All work shall be performed in accordance with the Contract Documents and all applicable local and state laws and regulations. Each Bid shall be accompanied by cash, a certified or cashier's check, or Bid Bond secured from a surety company satisfactory to the City Council, the amount of which shall not be less than ten percent (10%) of the submitted Total Bid Price, made payable to City of Davis as bid security. This Project, if awarded, will be awarded for a Summer 2024 start date. The Notice to Proceed shall be issued no sooner than June 25, 2024. As defined in the Contract, Section 00 52 13 CONTRACT b., the time for completion for this project is 200 working days. The time for completion for a subset of this project, the Great Lawn and adjacent former splash pad drainage improvements, shall be 20 working days beginning no sooner than October 1,, 2024. The purpose of these services was to provide information and geotechnical engineering recommendations relative to: Subsurface soil conditions Groundwater conditions Seismic site classification per the 2022 California Building Code (CBC) Site preparation and earthwork Foundation design and construction Subgrade preparation for play area surfacing

Award

Playgrounds / Parks / Athletic Fields

$2,632,284.00

Public - City

Site Work

46

29

78

5

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
53
Bidding Soon
1,547
All Active Projects
704
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 13, 2024

July 31, 2024

img_map_placeholder

5th St & B St, Davis, CA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.