BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Bayfield, Wisconsin. Completed plans call for site work for a water / sewer project.

Award Details Contract Award Date: Sep 14, 2022 Contract Award Number: 140P6422C0008 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: KZ2NLYTD7HJ7 Contractor Awarded Name: NELSON CONSTRUCTION CO OF LA POINTE INC Contractor Awarded Address: , WI 54850 USA Base and All Options Value (Total Contract Value): $508995 SCOPE OF WORK: Work will consist of providing all labor, materials, tools and other equipment necessary to remove and replace existing decking, joists, skirt boards, and deteriorated crib members as delineated on the drawings, removal and reinstallation of existing cleats, and placement of scour stone. Additional requirements information is provided in the solicitation, specifications, supporting documents, and other pertinent attachments. MAGNITUDE OF CONSTRUCTION: Between $500,000 and $1,000,000 for base line item. Between $1,000,000 and $5,000,000 for base line item + option A line item. TYPE OF CONTRACT: A firm-fixed price contract will be awarded. Construction Wage Rate Requirements for Bayfield County, WI will apply. SET-ASIDE: This project is set aside 100% for Total Small Businesses. SITE VISIT: An organized site visit has been scheduled for this solicitation - please see page 39 (52.236-27 Site Visit) below for more information. Specifications/Drawings Project work consists of providing all labor, materials, tools and other equipment necessary for the removal and replacement of existing decking, joists, skirt boards and deteriorated crib members as delineated on the drawings, removal and reinstallation of existing cleats, and placement of scour stone. Option A is in addition to the base contract and includes additional timber removal and replacement and installation of steel ice plates and solid timber backing on four side of the cribs per the schedules indicated on the drawings. Additional requirements information is provided in the solicitation, specifications, supporting documents and other pertinent attachments. "Specifications and other supporting documents are attached and incorporated herein. Refer to SECTION J." SECTION D - Packaging and Marking No clauses included SECTION E - Inspection and Acceptance 52.246-12 -- Inspection of Construction. Inspection of Construction (Aug 1996) (a) Definition. "Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components. (b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract. Commencement, Prosecution, and Completion or Work (Apr 1984) The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 365 calendar day after receipt of Notice to Proceed. The time stated for completion shall include final cleanup of the premises. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$508,995.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
9
Bidding Soon
273
All Active Projects
84
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 26, 2022

September 22, 2022

September 22, 2023

img_map_placeholder

To Be Determined, Bayfield, WI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.