BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Demolition, site work, outdoor lighting and addition to a mixed-use development in Modesto, California. Design plans call for the addition of a playground / park / athletic field; for the demolition of a playground / park / athletic field; for site work for a playground / park / athletic field; sidewalk / parking lot; and for outdoor lighting for a sidewalk / parking lot.

As of August 14, 2024, an architect has been selected for the project. Bidding is estimated to take place in fall of 2024. *The closed solicitation has been included below for reference: Response Types Line Items Type of Award Lump Sum Bid Valid Liquidated Damages Estimated Bid Value N/A Start/Delivery Date February 2024 Project Duration Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Pre-Bid Meeting No Online Q&A No The City of Modesto is soliciting proposals from landscape architectural and engineering firms to complete construction documentation for the Dr. Martin Luther King Jr. Park Renovation Project in Modesto. The new recreational features that will be added to the existing park in this renovation will include a 7,500 square foot gymnasium addition, with an indoor basketball court, attached to the existing King-Kennedy Memorial Center, five (5) outdoor fitness stations, one (1) splash pad, three (3) game board tables, one (1) ping pong table, one (1) stage with a plaza, one (1) baseball field, one (1) soccer field, one (1) basketball court, 1,700 linear feet of accessible exercise walking path, benches, tables, light fixtures, security cameras and accessible parking lots will be installed with this proposed project. Email all questions to jortega@modestogov.com by 3:00 p.m., no later than 7 business days prior to the proposal due date. All questions should be addressed to the Parks Planning and Development Division, Attn: Jason Ortega, phone: (209) 577-5437.

Design

Playgrounds / Parks / Athletic Fields

$6,552,000.00

Public - City

Addition, Demolition, Outdoor Lighting, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
165
Active Projects
87
Bidding Soon
1,719
All Active Projects
722
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2024

img_map_placeholder

601 S M.L.K. Dr, Modesto, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.