Site work for a civil project in Spring, Texas. Completed plans call for site work for a water / sewer project.

Windypine Lift Station No. 1 The project is located in Bilma Public Utility District. Windypine Lift Station No. 1 is located at 16802 Windypine Drive, Spring, Texas 77379 (Harris County Key Map 330-H). Kuykendahl Lift Station No. 2 is located at 18855 1/2 Kuykendahl Road, Spring, Texas 77379 (Harris County Key Map 331-A). Country Meadows Lift Station No. 3 is located at 19303 1/2 Country Meadow Lane, Spring, Texas 77388 (Harris County Key Map 331-B). Dover Mills Lift Station No. 4 is located at 16715 1/2 Dover Mills Drive, Spring, Texas 77379 (Harris County Key Map 330-H). The work includes but is not limited to the cleaning and application of 100% solids epoxy to the wet well walls and underside of top slab; the application of one-inch (1") of concrete repair mortar to damaged areas of the wet well walls and underside of top slab; blasting and recoating of all wet well and above ground piping and valves; installation of two (2) 6" ductile iron spool pieces with Air and Vacuum Valves; demolition and replacement of the pump stainless steel guide rail assemblies; installation of stainless steel intermediate guide bar brackets; installation of shallow offset pipe supports; installation of a doghouse manhole on the influent 8" sanitary sewer pipe Northeast of the wet well; two (2) bypass pumping systems for one month to complete the work; site restoration; flood control ditch restoration; and all else as shown on the construction drawings and detailed in the specifications for a fully functioning lift station. The work also includes the application of one (1) additional inch of concrete repair mortar to damaged areas of the wet well walls and underside of top slab at Windypine Lift Station No. 1 as needed and confirmed by the Engineer. Bid Details Location has changed from Teleconference Call - Info will be posted on 1/24/2022 to Teleconference Call - TEAMS Bid Details Notes have changed from to 1-832-856-3756; Conference ID: 201 709 321# Kuykendahl Lift Station No. 2 The work includes but is not limited to the cleaning and Holiday testing of the T-Lock liner on the wet well walls; demolition and replacement of all wet well riser piping, fittings, and stainless steel intermediate guide bar brackets; blasting and recoating of all above ground piping and valves; bypass pumping system for one month to complete the work; site restoration; and all else as shown on the construction drawings and detailed in the specifications for a fully functioning lift station. The work also includes the installation of 6-inch by 6-inch (6"x6") patches and 12-inch by 12-inch (12"x12") patches of T-Lock liner as needed based on the Holiday test results and as confirmed by the Engineer. Country Meadows Lift Station No. 3 The work includes but is not limited to the cleaning and Holiday Testing of the T-Lock liner on the wet well walls; cleaning and application of a 100% solids epoxy coating the valve vault walls, floor, and underside of top slab; application of one-inch (1") of concrete repair mortar to damaged areas of the valve vault walls, floor and underside of top slab; demolition and replacement of all piping, fittings and valves; installation of a permanent bypass connection; bypass pumping system for one month to complete the work; site restoration; and all else as shown on the construction drawings and detailed in the specifications for a fully functioning lift station. The work also includes the installation of 6-inch by 6-inch (6"x6") patches and 12-inch by 12-inch (12"x12") patches of T-Lock liner as needed based on the Holiday test results and as confirmed by the Engineer. Dover Mills Lift Station No. 4 The work includes but is not limited to , the demolition and removal of existing T-Lock liner; the application of one-inch (1") of concrete repair mortar to all damaged areas of the wet well walls, floor and underside of top slab; the application of protective coatings to the wet well walls, floor, and underside of top slab; demolition and replacement of all wet well riser piping, fittings, stainless steel intermediate guide bar brackets, and stainless steel riser pipe supports; blasting and recoating of all above ground piping and valves; installation of a rigid wet well safety grate; demolition and replacement of the pump controller; bypass pumping system for one month to complete the work; site restoration; and all else as shown on the construction drawings and detailed in the specifications for a fully functioning lift station. The work also includes the application of one (1) additional inch of concrete repair mortar to damaged areas of the wet well walls, floor, and underside of top slab at Dover Mills Lift Station No. 4 as needed and confirmed by the Engineer.

Bid Results

Water / Sewer

$812,400.00

Public - City

Site Work

17

26

9

7

Subscribe For Documents

80 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
333
Active Projects
218
Bidding Soon
4,241
All Active Projects
1,704
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 25, 2022

February 24, 2022

March 25, 2022

img_map_placeholder

Multiple Locations, Spring, TX

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.