Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in Montgomery, Alabama. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; and bridge / tunnel.
ALDOT is issuing an RFQ/RFP to procure the Project, and will enter into one or more Design-Build Agreement, in accordance with Section 23-1-40 of the Code of Alabama, 1975, as amended by Act 2016-257, and other applicable provisions of Alabama law. All firms or teams of firms desiring to enter into a Design-Build Agreement are invited to submit Proposals pursuant to the RFQ/RFP. Proposers must comply with the terms of the RFQ/RFP. As of January 5, 2024, construction had commenced May 1, 2023. Completion is expected December 31, 2027. All trades have been awarded. ALDOTs goals for the Project are to: Realize the benefits of progressive design-build project delivery, such as risk mitigation through early contractor involvement, collaborative project development, and reducing the overall schedule for delivery of the Project; Complete Usable Segments for partial acceptance by ALDOT and open to traffic; Uphold the trust of Stakeholders and the public in delivering the Project; Encourage participation of in-state, Alabama based contractors and firms; Deliver the Project within ALDOT's budget; and Complete the Project on or before December 31, 2027 The RFQ/RFP will provide full details of the Proposal required from interested Design-Build Teams and will include project goals for DBE participation. The RFQ/RFP will include a preference for Alabama-based proposers. Proposing firms must be pre-qualified according to ALDOT's Prequalification Process Potential proposers are advised that communication can be made only with the designated Project point of contact. The contact person for this Project is: David Welch The work envisioned for the Project will include the following features: The Project consists of approximately 70 miles of roadway improvements including 25 bridges. The Project is anticipated to have two pre-determined sections: A southern portion will begin at Highway 43 in Thomasville and run north to the south intersection with the Linden Bypass. The Project will add two additional lanes to existing U.S. 43 from Thomasville to south of Linden. Widening will continue north on Highway 43 to Linden. A northern portion will begin from the north intersection with the Linden Bypass to Highway 69 North of Moundville. North of Linden the Project will add two lanes to the existing two lanes of Highway 69. The Project will cross U.S. 80 and continue north on Highway 69 through Greensboro where it will ultimately connect with the existing four lanes of Highway 69 north of Moundville. The Department reserves the sole right, without incurring any liability, to change any aspect of the proposed procurement described above, including the right not to proceed with the procurement and/or the right to proceed in a different manner or on a different timeline than as described above. ALDOT - RFQ D/B - West Alabama Highway Design -Build Project As of September 19, 2022, contract negotiations are underway, and a selection is expected to be announced in the fourth quarter of 2022. Construction is expected to commence in November of 2022. *This project has been awarded and all trades have been let.
Under Construction
Roads / Highways
$775,000,000.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 20, 2022
May 1, 2023
Multiple Locations, Montgomery, AL
Related To This Project
Montgomery, AL
Bid Date: Sep 20 2021
Montgomery, AL
Bid Date: Mar 02 2023
Montgomery, AL
Bid Date: Nov 21 2022
Montgomery, AL
Bid Date: Sep 22 2022
Montgomery, AL
Bid Date: Jan 17 2023
Montgomery, AL
Bid Date: Dec 08 2022
Montgomery, AL
Bid Date: Apr 06 2023
Montgomery, AL
Bid Date: Nov 15 2022
Montgomery, AL
Bid Date: Nov 28 2022
Montgomery, AL
Bid Date: Dec 02 2022
Montgomery, AL
Bid Date: Aug 11 2022
Montgomery, AL
Bid Date: Nov 15 2022
Montgomery, AL
Bid Date: Sep 22 2022
Montgomery, AL
Bid Date: Nov 10 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Try it free. The data you need to build the relationships you want.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.