BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work for a water / sewer project in Clemson, South Carolina. Completed plans call for site work for a water / sewer project.

Project Number: CUP 4003118 Existing building exterior to be cleaned, all masonry joints and misc. mortar to be prepped and repaired. Exterior window and door framing and trim will be cleaned, prepped, recaulked and repaired as indicated on drawings. Lattice steel framing will be repaired on all connection hardware and plates. Areas to be painted are indicated on drawings. Bid security is required in an amount not less than 5% of the base bid CONSTRUCTION COST RANGE: $ 225,000 to $ 250,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Scope of work includes removal and replacement of all exterior sealants (horizontal, vertical, wet glazing at window / door units, handrail penetrations, louvers, wall penetrations, metal lattice, etc. 2. Scope of work includes removal and demolition of all existing components necessary to complete selective masonry wall repairs in all areas where cracks, damage, abandoned penetrations, mortar dis-bondage, etc. are present. Repair mortar and binding agent for re-pointing, All associated components and accessories are included. 3. Scope of work includes all metal lattice be examined and all present damages to connections and fasteners be replaced with new. This includes fasteners / bolts and washers and all associated components to be replaced with new to match existing in size, length, and type. 4. Scope of work includes re-furbish all access panels at locations that exist under the stair way locations. New access panels shall be cleaned, primed, and paint with two coats of exterior grade paint. 5. Scope of work includes cleaning of all the exterior walls (brick, concrete, metal lattice, windows / doors, etc.) Exterior wall cleaning shall include applying cleaning solution in accordance with the manufacturer's written instructions using a low-pressure sprayer or by brush and then completing a complete appropriate pressurized water cleaning method.

Award

Water / Sewer

$203,352.00

Public - State/Provincial

Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
50
Bidding Soon
840
All Active Projects
352
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 8, 2022

March 10, 2022

img_map_placeholder

230 Kappa St, Clemson, SC

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.