EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 4, 2022 at 7:00 PM

Updated October 1, 2024

Renovation of a municipal facility in Harrisburg, Pennsylvania. Completed plans call for the renovation of a municipal facility.

In accordance with the Separation Act (P.L. 155, May 1, 1913), separate bids are required and shall be submitted for the following Construction Contract. When bidding, amount Bid should be in dollars and cents, no fractions of a cent will be accepted. Questions concerning project specifications and requirements should be directed to Chris Clouser (PGC Engineering Division) by phone at 717-787-4250 Ext. 73620 or by email: cclouser@pa.gov. Any questions concerning completion of the electronic Bid should be directed to the PGC Contracts and Procurement Division at 717-787-6594. The Pennsylvania Game Commission (PGC) is soliciting electronic Bids for building renovations to expand the Consolidated Dispatch Center at the headquarters building located in Susquehanna Township, Dauphin County. The scope of the project generally involves renovations to the existing building including but not limited to selective demolition, wall framing, wall finishes, sound proofing, suspended ceiling systems, finish flooring, doors and door hardware, architectural casework, plumbing systems and fixtures; normal and emergency power distribution wiring and wiring devices, interior lighting and lighting controls, emergency and exit lighting, pathways and boxes for data communication systems and related work. Bidders shall be experienced and fully capable to perform the type and extent of Work required on this project. After Bids are opened, the PA Game Commission reserves the right to request the names and contact information from at least three (3) references for projects completed within the previous three (3) years that are similar in size and scope in order to verify experience and qualifications. Reference information shall include: Project Name, Description, and Final Cost; and Reference Name, Company, Address, and Phone No. Attached to the project listing in electronic format are this Bid Notice, Project Terms and Conditions, Specifications, and applicable Drawings / Details. These documents are all part of the electronic proposal. Bids must be submitted electronically using the SRM system and must be submitted by the Bid Opening date and time listed above. A bid guarantee or bond is not required. The Commonwealth reserves the right to reject any and all Bids, to waive technical defects in Bids and to accept or reject any part of the Bid deemed in the best interests of the Commonwealth. Except as otherwise provided by law, award will be made to the lowest responsible and responsive Bidder, and all Bidders will be advised of the Bid results. A Purchase Order will be generated at the time of award without further input from the successful Bidder. Awarded vendor will be sent a copy of this document and no work will be authorized until the vendor is in receipt of the Purchase Order. All vendors who conduct business with the Pennsylvania Game Commission must have a Vendor Number assigned to them in order to conduct business and receive payment from the Commonwealth. Access the website www.pasupplierportal.state.pa.us or phone (877) 435-7363 or (717) 346-2676 or email ra-srmhelp@state.pa.us for assistance to register as a new vendor or, if you are an existing vendor, to change a main or remit to address.

Bid Results

Municipal

$89,600.00

Public - State/Provincial

Renovation

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roofing and Siding Panels, Siding, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Wood Doors, Windows, Hardware, Door Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Flooring, Carpeting, Wall Finishes
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment, Computers
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 26 - Electrical

Division 26 - Electrical

Electrical, Schedules for Electrical, Low-Voltage Electrical Distribution, Low-Voltage Distribution Equipment, Wiring Devices, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Common Work Results for Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Access Control and Intrusion Detection
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment

Find More Local Projects

Within 75 Miles of This Project
158
Active Projects
97
Bidding Soon
1,336
All Active Projects
602
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 26, 2022

February 28, 2022

img_map_placeholder

2001 Elmerton Ave, Harrisburg, PA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

23WHM-HQ Dispatch Phase 2: General Contract No. 1

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.