BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 1, 2022 at 7:00 PM

Updated January 30, 2025

Site work, paving and renovation of a civil project in St Charles, Illinois. Completed plans call for site work for a water / sewer project; for the renovation of a water / sewer project; road / highway; and for paving for a road / highway.

**As of February 1, 2022. This project has not yet been awarded. A timeline for award has not yet been established.** As of January 25, 2022, the project has not been awarded yet. A timeline for award has not been established yet. Project no- MSET File No. 21405 Disadvantaged Businesses Martam Construction, Inc. 1200 Gasket Dr. Elgin, IL 60120 (847) 608 -6800 is seeking disadvantaged businesses for the City of St. Charles Well No. 7 and 13 for subcontracting opportunities in the following areas: Mechanical, Electrical, Rough Carpentry, Asphalt and Landscaping work All disadvantaged businesses should contact George Ismail at (630) 217-6234 or via email George@martam.com to discuss the subcontracting opportunities. ONLY bidders listed on the Trotter & Assocs. Plan Holders List will be considered responsive bidders and that duplication and distribution of all or part of these plans and specifications is strictly prohibited without written permission from Trotter & Assocs. Documents provided by Construction Connect are to be used by Construction Connect subscribers for sub-bid and supplier pricing only Bidder questions must be received by Wednesday, January 12th, 2022. After this date further questions will not be answered. A. Demolition 1. Concrete sidewalk / Asphalt. 2. Existing Well #7 Treatment Building - structures, pipe, filters, pumps, etc. 3. Existing Subgrade Pumping Station - structures, pipe, pumps, generator, etc. B. Site Work 1. Site grading and earthwork. 2. Paving and restoration. 3. Fencing and Security 4. Site piping (raw water, finished water, sanitary forcemain etc.). 5. Site electrical. C. Well #7 Rehabilitation 1. Install new well pump and pitless adapter. 2. Replace electrical controls and panels onsite. D. Oak Street Treatment Facility Rehabilitation: 1. Installation of new filter units. 2. Expansion of existing chemical feed system. 3. Construction of structural reinforcements to support new filter. 4. Installation of face piping to support flow to both filter sets. 5. Install metering and chemical injection. 6. Installation of new submersible waste pumps in the backwash holding tank Location: City of St. Charles Well #7 Treatment Facility located at 228 N. Randall Road and Oak Street Treatment Facility located at 2595 Oak Street, St. Charles, IL 60175.

Bid Results

Water / Sewer

$6,270,000.00

Public - City

Paving, Renovation, Site Work

117

32

54

3

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
463
Active Projects
249
Bidding Soon
3,409
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 19, 2022

February 18, 2022

Project location map

Multiple Locations, St Charles, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.