Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and renovation of a mixed-use development in Calmar, Iowa. Completed plans call for the renovation of a educational facility; for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
The scope ofwork for the project located at NICC Calmar Campus, 1625IA-150, Calmar, IA. 52132, includes, but is not limited to the following: The Plans and Specifications contain the details and requirements of Planning/ Pre-Construction Phase Start February 22, 2022, Completion approximately March 30, 2022 if weather permits. Phase 1: Excavation/ Site Utilities Start March 30, 2022 for the over excavation of unsuitable soils; replacement with engineered fill, and installation of Site Utilities and preparation of site for 4 weeks "Rest and Settlement" per the Geotechnical Report. Phase 2 -- Building Construction; Design-Build Plumbing; HVAC, Electrical and Site Work Start May 31, 2022, completion August 31, 2022. Exterior Concrete Work; HMA Paving; Site Work Start August 31, 2022, Completion September 30, 2022. Bids will be received and project constructed under separate sub-contracts. Bids for each sub-contract must be on a lump sum basis. The Sub-contracts are as follows: Phase 1, Contract #1: Earthwork/ Site Utilities/ Site Work Phase 2, Site Work of Contract #1 and Contracts #2 thru #7 which includes: Contract #2: General Contract for the Construction of the Maintenance Building (Pole Building) Contract #3: Concrete - includes all concrete work on project. Footings, foundation walls, floor slab, concrete approaches, sidewalks; curbs and gutters. Contract #4: HMA Paving - paving of parking lot and drive. Contract #5: Plumbing - Design Build of all plumbing inside the building and connecting to Black Hills Energy natural gas service and water and sewer site utilities run within 5 feet of building. Contract #6: HVAC - Design Build of all heating, cooling, and ventilation equipment and ductwork within the building. Contract #7; Electrical - Design Build of all electrical within the building and connecting to Alliant Energy electric services. Work to commence for Project on or after February 22, 2022, with completion of work as follows: Planning/ Pre-construction Phase - Commence February 22, 2022, Completion March 30, 2022 Phase 1 - Earthwork/ Site Utilities - Commence March 30, 2021 (or when frost is substantially out of ground), Substantial Completion of the Earthwork/ Site Utilities portion of Phase 1 on April 30, 2022 (weather permitting). Site "Rest and Settlement" for 4 weeks as per Geotechnical Report-Commence April 30, 2022, completion May 30, 2022. Phase 2: Building Construction & Concrete/ Plumbing/ HVAC/ Electrical - Commence May 31, 2022, Substantial Completion August 31, 2022. Exterior Concrete/HMA Paving/ and Site Work - Commence August 31, 2022, Completion September 30, 2022. Each Bid shall be submitted on the Bid Form provided with the Bidding Documents. No oral, facsimile or telephonic bids or modifications will be considered. Bids shall be addressed and delivered to the Calmar Campus Administration Board Room, NICC 1625 Hwy 150 S. P.O. Box 400 Calmar, IA 52132--Attention Dave Dahms, Vice President of Finance and Administration, in sealed envelopes marked with the Project Name and name and address of Bidder. All bids shall be sealed and plainly marked. Any alteration of the bid form may be cause for rejection of the bid. Deposits for hard copies of the documents shall be refunded upon return of the contract documents in reusable condition within fourteen (14) days after Award of Contract. If the contract documents are not returned in a timely manner and in a reusable condition, the deposit shall be forfeited. The Owner requests that non-bidders return documents as soon as possible before bid opening. Successful bidders will be allowed to retain the document sets in their possession and have their deposit(s) refunded to them. Each Bid shall be accompanied by Bid Security in the amount of 10% of the total bid submitted. Bid Security must be in the form set forth in the Instructions to Bidders. Bid Security must in 1 of the following forms: Certified Check, Cashier's Check, Credit Union Certified Share Draft or an approved Bond Form. The successful Bidders will be required to furnish a Certificate of Insurance and Performance and Labor and Material Payment Bonds both in an amount equal to 100% of the Contract Price and in accordance with other requirements outlined in the Bid Documents. Should the successful bidder fail or neglect to furnish satisfactory performance/payment bonds, refuse to enter into a Contract on the basis of the bid, or fail to meet the requirements of this Notice and the specifications regulating the award, the bidder's security may be retained as liquidated damages. No bidder may withdraw his or her bid for a period of forty five (45) calendar days after the date and hour set for opening of bids
Post-Bid
Educational
Public - State/Provincial
Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 14, 2022
February 22, 2022
1625 IA-150, Calmar, IA
Related To This Project
Calmar, IA
Bid Date: Feb 15 2022
Calmar, IA
Bid Date: Mar 17 2022
Calmar, IA
Bid Date: Feb 22 2024
Calmar, IA
Bid Date: Jan 19 2022
Calmar, IA
Bid Date: Aug 25 2021
Calmar, IA
Bid Date: Sep 19 2023
Calmar, IA
Bid Date: Aug 17 2023
Calmar, IA
Bid Date: Feb 16 2021
Calmar, IA
Bid Date: Feb 03 2022
Calmar, IA
Bid Date: Apr 21 2022
Calmar, IA
Bid Date: Dec 20 2022
Des Moines, IA
Bid Date: Jan 19 2022
Des Moines, IA
Bid Date: Jan 19 2022
Ames, IA
Bid Date: Jan 31 2022
Garrison, IA
Bid Date: Feb 01 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.