BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a mixed-use development in West Tisbury, Massachusetts. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

Masonry, Miscellaneous and Ornamental Iron, Waterproofing, Dampproofing, & Caulking, Roofing & Flashing, Glass & Glazing, Ceramic Tile, Acoustical Tile, Resilient Flooring, Painting, Elevators, Fire P. Pre-qualification of Filed Subcontractors for Renovation and Addition of 73,584 GSF School Building. Statement of qualifications will be submitted electronically only. The Project is the renovation of approx. 42,500 GSF of the existing 1929 section of the original building and the 1993 addition to the existing building, partial demolition of the 1939 and 1951 sections of the existing building, and new construction of approx. 32,000 GSF that will provide educational program spaces, a gymnasium, and administrative and support spaces. The 5.15-acre site is located at 40 West William Street in the town of Tisbury, Massachusetts. The construction program will be undertaken while the school remains operational in temporary facilities, using modular classrooms that will be located on a section of the existing site and on an adjacent parcel of land. A detailed plan for phasing will be undertaken to best coordinate with the educational programs and to minimize the impact on students and staff. The construction program is expected to be undertaken in two or three phases, including the potential for an early site and demolition phase. The Project will follow the US Green Building Council’s LEED for Schools (LEED-S) Rating System. The project is being designed to be “Net Zero Ready” and will explore the potential of utilizing photovoltaics and other alternative energy efficient solution, which could realize a life cycle cost benefit to the Town. It is the intention of this project to produce a New England Collaborative for High Performing Schools (NE-CHPS) verified facility

Post-Bid

Educational

$44,000,000.00

Public - City

Addition, Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

95 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
102
Bidding Soon
1,941
All Active Projects
836
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 26, 2022

March 28, 2022

img_map_placeholder

To Be Determined, West Tisbury, MA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.