BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Woodbridge, Virginia. Completed plans call for the renovation of a 43,800-square-foot educational facility.

The Project consists of construction of the replacement of roof systems and related work at Neabsco Elementary School as shown on Contract Documents prepared by Facility Engineering Associates, P.C. (FEA), dated December 29, 2021. B. The Work generally consists of the replacement of approximately 43,800 square feet of existing roof with a modified bitumen membrane If the Bidder does not achieve the dates provided in Section 001010, Paragraph 1.2(c) as they may be adjusted under the Contract Documents, Bidder agrees that the damages suffered by the Owner for delay will be difficult to ascertain with any certainty, and agrees that the Owner may withhold the sum of One Thousand Five hundred dollars ($1,500.00) for each calendar day of delay beyond the agreed upon date for reaching Substantial Completion as liquidated damages and not as a penalty. This amount shall be collected per individual roof section or specific scope item that is not completed prior to the completion date listed in the Contract until such roof section or work item is deemed to meet the requirements of Substantial Completion. D. Once Substantial Completion has been awarded by the Architect, a time limit stipulated by the Architect and Owner will be allowed to the Contractor for the Contractor to complete the "punch list" and other close out requirements. Bidder agrees that the damages suffered by the Owner for delay in final completion will be difficult to ascertain with any certainty, but include possible disruption to school activities, extended contract administration costs and architectural fees. Accordingly, if Final Completion is not achieved within the allotted time, then the Owner shall be entitled to the sum of One Thousand dollars ($1,000.00) for each calendar day beyond the allotted time the work is not completed as liquidated damages and not as a penalty.

Award

Educational

$1,353,377.00

Public - County

Renovation

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
161
Active Projects
78
Bidding Soon
1,894
All Active Projects
750
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 19, 2022

March 2, 2022

img_map_placeholder

3800 Cordell Ave, Woodbridge, VA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.