BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a water / sewer project in Moline, Illinois. Completed plans call for the renovation of a water / sewer project.

The City of Moline, Illinois is seeking professional proposals for design-build services to replace the electrical control systems for the Heating, Ventilation and Air Condition System at the water treatment plant. This Request for Proposals (RFP) outlines the requirements and selection process. Because this is a design-build project, the City will consider proposals from single entities, partnerships or joint-ventures. The winning candidate will perform all the work required to achieve the desired outcome. There is no expressed or implied obligation for the City of Moline to reimburse responding firms for any expenses incurred in preparing proposals in response to this request. During the evaluation process, the City of Moline reserves the right, where it may serve the City's best interest, to request additional information or clarification from proposers, or to allow corrections of errors or omissions. 3/2/2022- Notice to proceed 5/15/2022 - Work completed Questions, comments, or concerns related to this request should be directed to: Tony Loete Utilities Director Phone (309) 524-2301 Email: tloete@moline.il.us The City of Moline reserves the right without prejudice to reject any or all proposals. SCOPE OF SERVICES The following items will be included in this project: Phase 1 - provide not to exceed pricing to complete the following. Provide new open license - Tridium Niagara N4 System to replace the obsolete R2 system. Provide functionality for multiple users to access system through standard graphical interface. Provide remote connectivity to Niagara system via internet. Provide trending, alarming, and notifications to onsite staff. Demo existing JACE-500 series controller and replace with new JACE 8000 series controllers with 24-month standard maintenance agreement. Replaces failed F-AHU-2 VFD unit and integrates with new control system. Existing controllers, sensors, equipment, devices, etc. will be reused pending evaluation in phase 2. Existing controllers, sensors, devices, or equipment found to be failed during phase 1 work shall be replaced by partner on a time and materials basis only as authorized by the City. Provide schematics and drawings related to new control system. Develop Niagara graphic displays as needed to replicate existing operational control screens. Integrate and test equipment with coordination of city staff to limit disruptions to heating and cooling systems. Provide one-year warranty for workmanship and code bugs in addition to manufacturer warranty for equipment. Provide Niagara operational training as recommended by Tridium; and provide 4 hours training to City Staff on operations and troubleshooting of system. Agreement to standard contract terms concerning insurance, indemnification, statutory requirements (e.g., requirement for a policy prohibiting sexual harassment; the requirement to pay the prevailing rate of wages for those portions of work subject to the Illinois Prevailing Wage Act; compliance with the Public Construction Bond Act; compliance with all federal laws, regulations and directives concerning acceptable telecommunications systems). Phase 2 - provide not to exceed pricing to replace the following work (itemized per controller) Evaluate functionality of all eight XL15 controllers after phase 1 is complete. Report evaluation findings to City. Demo existing XL15 controllers and supporting I/O modules as requested by City. o Building B (Head House) - B-TCP-1, B-TCP-2 o Building C (Filter Gallery) - C-TCP-1 o Building D (Sedimentation Basins) - D-TCP-1 o Building E (Claricones & Chemical Storage) - E-TCP-1 o Building F (Administration) - F-TCP-1, TCP-2 o Building H (Shorewell) - H-TCP-1 Install LON Honeywell Spyder Series controllers and I/O modules as requested by City. Commission, test, and verify operations of all newly installed controllers. Existing sensors, equipment, devices, etc. will be reused. Existing controllers, sensors, devices, or equipment found to be failed during phase 2 work shall be replaced by partner on a time and materials basis only as authorized by the City. Phase 3 Evaluates existing Kathabar dehumidification system and its effectiveness. Evaluates steam needs in for administration building and dehumidification. Provides new steam boiler sized appropriately to serve administration building and/or dehumidification system, based on evaluations listed above. Performs necessary piping to integrate new steam boiler into Kathabar dehumification system. Performs necessary piping to integrate new steam boiler into existing heat exchange equipment in lower level of administration building. Install and integrate new steam boiler system into Niagara control system. Demos/disconnects existing steam boiler piping as necessary. Develops, provides procedures, and trains city staff on startup and shutdown of new AND existing boiler systems.

Post-Bid

Water / Sewer

$200,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
45
Bidding Soon
603
All Active Projects
304
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 28, 2022

March 2, 2022

img_map_placeholder

To Be Determined, Moline, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.