Renovation of a power facility in Worthington, Minnesota. Completed plans call for the renovation of a power facility.

The material required is as follows: A new lineup of 15 kV indoor metalclad switchgear including eight (8) vacuum circuit breakers with related controls and accessories and two (2) control panels. The above equipment shall be in accordance with the specifications and proposed form of contract now on file in Worthington Public Utilities offices in said city of Worthington, Minnesota, by this reference made a part hereof, as though fully set out and incorporated herein. Each bid shall be made out on bid forms furnished by the Engineer and shall be accompanied by either a certified check or a bid bond executed in an amount not less than ten percent (10%) of the amount of the Bid. The bid security shall be made payable to Worthington Public Utilities. The bid security must not contain any conditions either in the body or as an endorsement thereon. Such bid security shall be forfeited to Worthington Public Utilities as liquidated damages in the event the successful bidder fails or refuses to enter into a contract and post a satisfactory Performance Bond. Upon shipment of the complete equipment, the Supplier shall submit to the Owner a detailed statement of the equipment shipped and installed. The Owner shall, within thirty (30) days after delivery receipt of the material and associated invoice, pay the Supplier ninety-five percent (95%) of the contract price of the material. The Owner shall within thirty (30) days after final completion, field assembly, testing, required test reports, record drawings, final documentation, and certification by Engineer, pay the Supplier the remaining five percent (5%) of the contract price. All materials shall be delivered by the dates set in the Specifications. Worthington Public Utilities reserves the right to defer acceptance of any bid for a period not to exceed thirty (30) days after the date bids are received and no bid may be withdrawn during this period. Worthington Public Utilities also reserves the right to reject any or all bids and enter into such contract as it shall deem to be in the best interest of Worthington Public Utilities.

Post-Bid

Power Plant

$200,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
48
Bidding Soon
463
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2022

March 1, 2022

Project location map

Multiple Locations, Worthington, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.