Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 25, 2022 at 7:00 PM
Updated November 15, 2023
Site work and asbestos abatement for an educational facility in Frankfort, Illinois. Completed plans call for site work for a educational facility; and for asbestos abatement for a educational facility.
Phase 2: Remove lab tops (approximately 335 square feet) under the School's Operations & Manintenance Program and base cabinets from science rooms 118, 119 and 120. Remove stainless steel counter system (approximately 45 square feet) under the School's Operations & Maintenance Program and base cabinets from Art Room 117. Remove floor tile and associated mastic (approximately 6,595 square feet) from various corridors, classrooms, storerooms, and restrooms on first and second floors of the south building utilizing non-friable methods. Remove carpet and associated mastic (approximately 11,450 square feet), including underlying floor tile and associated mastic where present, from various classrooms on first and second floors of the south building utilizing non-friable methods. June 7, 2022-July 5, 2022. Phase 3: Remove floor tile and associated mastic (approximately 7,165 square feet) from various corridors and storerooms, kitchen, elevator, nurses' office, office restroom, and south stairwell/vestibule on first and second floors of the south building utilizing non-friable methods. Remove carpet and associated mastic (approximately 9,755 square feet), including underlying floor tile and associated mastic where present, from office area, library and various classrooms on first and second floors of the south building utilizing non-friable methods. Remove terrazzo with trace asbestos (approximately 1,095 square feet) from the commons area and corridor adjacent to the main building entry. Tentatively scheduled for May 30, 2023 - June 22, 2023.
Award
Educational
$283,805.00
Public - City
Asbestos Abatement, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 11, 2022
February 11, 2022
22265 S 80th Ave, Frankfort, IL
Related To This Project
Frankfort, IL
Bid Date: Feb 16 2022
Frankfort, IL
Bid Date: Feb 14 2022
Frankfort, IL
Bid Date: Mar 16 2022
Frankfort, IL
Bid Date: Mar 11 2022
Frankfort, IL
Bid Date: Mar 07 2022
Frankfort, IL
--
Frankfort, IL
--
Frankfort, IL
Bid Date: Dec 22 2021
Frankfort, IL
Bid Date: Jan 13 2022
Frankfort, IL
--
Frankfort, IL
Bid Date: Oct 04 2023
Frankfort, IL
Bid Date: Aug 31 2023
Frankfort, IL
Bid Date: Aug 01 2023
Frankfort, IL
Bid Date: Feb 04 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
