BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Tuscaloosa, Alabama. Completed plans call for site work for a water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of 2/15/22 this project is on hold and they are not sure what the outcome will be at this time. Award of the contract will be made within forty-five (45) calendar days from the date of the bid opening. Sanitary construction, storm drain construction and slope repair. B. The approximate quantities of said Project are as follows: 200 s.y.i.p. of Topsoil Replacement, 100 c.y.i.p of Off-Site Borrow Material, 350 tons of Permanent Rip-Rap, 2,500 s.y. of Geotextile Filter Blanket, 80 s.y. of Crushed Aggregate, 95 s.y. of Planing & Wearing Surface Replacement, 60 l.f. of Valley Gutter, 169 l.f. of 8" DI Class 350 Sanitary Sewer, 60 l.f. of 6" Sanitary Sewer, 126 l.f. of 8" PVC Sanitary Sewer, 200 c.y.i.p. of ALDOT Section 801 Crush Aggregate, 50 tons of ALDOT Section 801 Coarse Aggregate, 250 l.f. of 12" Storm Drain, erosion control, and other associated appurtenances From the date stated in the Notice to Proceed, the Project time of construction is thirty (30) consecutive calendar days. The City reserves the right to reject all bids and/or reject and rebid the Project should it determine the same is in the best interest of the City. Each bidder must submit with its bid a cashier's check drawn on an Alabama bank or a fully executed bid bond on the form that is contained in the Contract Documents executed by a surety company duly authorized and qualified to make bond in the State of Alabama. All bonds, sureties and/or cashier checks will be made payable to the City for an amount not less than 5 percent of the City's or its engineers or architects estimated cost of the Project or of the total bid in the proposal, but in no event more than $10,000.00. It is the intent of the City to foster competition among contractors, suppliers, and vendors that will result in better quality and more economical services rendered to the City. Under this policy, the City of Tuscaloosa has established a goal of ten to twenty percent (10-20%) inclusion of minority and disadvantaged business enterprises for all services required to deliver City projects. In no case shall the stated percentage be the determining factor in contract awards. Rather, contractors must demonstrate a good faith effort to attain the desired percentage goal.

Post-Bid

Water / Sewer

$600,000.00

Public - City

Paving, Site Work

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
33
Bidding Soon
554
All Active Projects
219
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 26, 2022

February 25, 2022

img_map_placeholder

Greensboro Ave, Tuscaloosa, AL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.