BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Tulare, California. Completed plans call for the renovation of a educational facility.

All questions concerning this project should be directed to: John Cleveland Infinity Communications & Consulting, Inc. (661) 716-1840 office (661) 716-1841 fax p2bids@infinitycomm.com This meeting is Mandatory, ALL Contractors attending will be required to sign in at the time of arrival and are also required to stay for the duration of the Pre-Construction Meeting. This project is anticipated to start after April 1, 2022, and is anticipated to have a duration of 120 days. All work shall be completed per the project schedule but no later than the project finish date. Liquidated damages in the amount of 500/day are included in this contract. All work shall be completed per the project schedule but no later than September 30, 2023. The OWNER reserves the right to reject any or all bids and/or waive any irregularities or informalities in any bids or in the bidding process. Each bid package will be awarded separately and independent of one another. The OWNER may, at their option, choose to award the projects to one contractor or any combination of contractors. The OWNER has determined the general prevailing rate of per diem wages in the locality in which this work is to be performed for each craft or type of worker needed to execute this contract. These rates are on file at the SCHOOL DISTRICT office located at location. Copies may be obtained upon request. A copy of these rates shall be posted at each job-site. The schedule of per diem wages is based upon a working day of eight (8) hours. The rate for holiday and overtime work shall be at least time and one-half. It shall be mandatory upon the contractor to whom the contract is awarded (CONTRACTOR), and upon any subcontractor under him, to pay not less than the said specified rates to all works employed by them in the execution of the contract. It is the CONTRACTOR'S responsibility to determine any rate change that may have or will occur during the intervening period between each issuance of written rates by the Director of Industrial Relations. During the Work and pursuant to Labor Code 1771.4(a)(4), the Department of Industrial Relations shall monitor compliance with prevailing wage rate requirements and enforce the Contractor's prevailing wage rate obligations. Each Bidder must be a DIR Registered Contractor when submitting a Bid Proposal. The Bid Proposal of a Bidder who is not a DIR Registered Contractor when the Bid Proposal is submitted will be rejected for non-responsiveness. All Subcontractors identified in a Bidder's Subcontractors' List must be DIR Registered contractors at the time the Bid Proposal is submitted. The foregoing notwithstanding, a Bid Proposal is not subject to rejection for non-responsiveness for listing Subcontractor the Subcontractors List who is/are not DIR Registered contractors if such Subcontractor(s) complete DIR Registration pursuant to Labor Code 1771.1(c)(1) or (2). Further, a Bid Proposal is not subject to rejection if the Bidder submitting the Bid Proposal listed any Subcontractor(s) who is/are not DIR Registered contractors and such Subcontractor(s) do not become DIR Registered pursuant to Labor Code 1771.1(c)(1) or (2), but the Bidder, if awarded the Contract, must request consent of the District to substitute a DIR Registered Subcontractor for the non-DIR Registered Subcontractor pursuant to Labor Code 1771.1(c)(3), without adjustment of the Contract Price or the Contract Time. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations No bidder may withdraw his bid for a period of THIRTY (30) DAYS after the date set for the opening of the bids. A BID BOND shall be required and shall be supplied with the CONTRACTOR'S bid on the day of the bid. All bids shall be presented under sealed cover and accompanied by one of the following forms of bidder's security: cash, a cashier's check, certified check, or a bidder's bond executed by an admitted surety insurer, made payable to the trustees. The security shall be in an amount equal to at least 10 percent of the amount bid. A bid shall not be considered unless one of the forms of bidder's security is enclosed with it. A Payment Bond and Performance Bond for contracts over $25,000.00 WILL BE required prior to the execution of the contract. The Payment and Performance Bond shall be in the form called for in the contract documents. Payment Bond and Performance Bond shall be provided upon receipt of the Notice to Proceed. Performance and Payment bonds shall be supplied prior to the beginning of construction. A Certificate of Insurance shall be required as well before work can begin. Pursuant to the provisions of the Public Contract Code, Sections 22300, CONTRACTOR may substitute certain securities for any funds withheld by OWNER to ensure their performance under the contract. At the request and expense of CONTRACTOR, securities equivalent to any amount withheld shall be deposited, at the discretion of the OWNER, with either OWNER or with a state or federally chartered bank, as the escrow agent, who shall then pay any funds otherwise subject for retention to CONTRACTOR. Upon satisfactory completion of the contract, the securities shall be returned to the CONTRACTOR. Securities eligible to investment shall included those listed in Government Code, Section 61430, bank and savings and loan certificates of deposit, interest bearing demand deposit accounts, standby letters of credit, or any other security mutually agreed to by CONTRACTOR and OWNER. CONTRACTOR shall be the beneficial owner of any securities substituted for funds withheld and shall receive any interest on them. The escrow agreement shall be essentially similar to the one indicated in the General Conditions. In accordance with Education Code section 17076.11, this district has a participation goal for disabled veteran business enterprises of at least 3 percent per year of the overall dollar amount of funds allocated to the district by the State Allocation Board pursuant to the Leroy F. Greene School Facilities Act of 1998 for construction or modernization and expended each year by the school district. Prior to, and as a condition precedent for final payment under any contract for such project, the contractor shall provide appropriate documentation to the district identifying the amount paid to disabled veteran business enterprises in conjunction with the contract, so that the district can assess its success at meeting this goal.

Post-Bid

Educational

$220,100.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
18
Bidding Soon
401
All Active Projects
190
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.