Published January 4, 2022 at 7:00 PM
Updated January 29, 2024
This is a service / maintenance or supply contract in Bainbridge Island, Washington. Contact the soliciting agency for additional information.
The study shall be conducted by a qualified VE Team utilizing the five-step job plan as recognized by the Society of American Value Engineers (SAVE). A presentation of the study results shall be made to the City. The VE Study shall be made by a multi-discipline team of five VE qualified professionals. The study group will follow the five-step job plan as recognized by the Society of American Value Engineers (SAVE). The VE report shall encompass the recommendations of the VE study group and include detailed cost estimates, life cycle analysis and sketches, as necessary. The typical VE Team will be composed of a. VE Team Leader (CVS)** b. Architect c. Structural Engineer d. Mechanical Engineer e. Electrical (or Civil) Engineer f. Typing, Clerical and Estimating support staff as necessary ** The principle person responsible for pre-study work, assembling, editing and reproducing the recommendations generated by the Value Engineering Team Study. C.V.S. must edit and sign the final report. Certified Value Specialist (CVS) Responsibilities: The CVS shall have the following responsibilities for the VE Study: a. Pre-Study (1) Review complete design package & identify high-cost areas. (2) Prepare cost model (actual vs. historical) (3) Prepare bar graphs of all sub systems. (4) Prepare preliminary cost worth ratios. b. 40 Hour Study (1) Team Leader and coordinator. (2) Team recorder. (3) Presentation of recommendations. c. VE Report Write and assemble report. Proof all VE recommendations, especially the cost estimate and life cycle analysis. Calculate redesign effort for each recommendation in manhours. VE Report Requirements: The results of the VE study performed on the project shall be documented as follows: (a) Contents page. (b) Brief description of total project and project requirements with a copy of the Owner's program requirements. (c) Brief summary of VE recommendations. (d) One site plan, floor plan and elevation on 8-1/2"x 11" or fold out. (e) Summary sheet (only) of 35% cost estimate. (f) VE cost model of project. (g) Each VE recommendation will be described "Before and After VE" and will be accompanied with a detailed cost estimate of savings, life cycle cost analysis, and sketches as necessary. (h) Complete 5 step job plan (worksheets) of all work will be submitted as appendices for reference. All reports must be systematically assembled and must be short and concise, yet informative enough for decision making. Oral Presentation: At the completion of the Value Engineering Study, the VE team leader and members as appropriate may be asked to make an oral presentation of the items recommended to be implemented on the project. Audience for the presentation may include representatives of the following: the A/E, and representatives of the City, and the public. The method of contractor selection has not been determined at this time.
Conceptual
Jails / Prisons
Public - City
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 19, 2022
Multiple Locations, Bainbridge Island, WA
Related To This Project
Bainbridge Island, WA
Bid Date: Dec 05 2018
Bainbridge Island, WA
--
Bainbridge Island, WA
--
Bainbridge Island, WA
--
Bainbridge Island, WA
--
Bainbridge Island, WA
--
Bainbridge Island, WA
--
Bainbridge Island, WA
--
Bainbridge Island, WA
Bid Date: Dec 02 2021
Bainbridge Island, WA
Bid Date: Sep 07 2023
Bainbridge Island, WA
--
Bainbridge Island, WA
Bid Date: Aug 25 2023
Bainbridge Island, WA
Bid Date: Jun 23 2023
Bainbridge Island, WA
--
Bainbridge Island, WA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.