BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Fenton, Michigan. Completed plans call for the renovation of a educational facility.

Any questions regarding details of this RFP should be directed to the Executive District's Director of Technology and District Services, Brad Reichert at 810-591-2570 or by e-mail at breichert@lakefentonschools.org. All bids will be considered firm for 120 days from the bid opening date. Right to Reject Bid The district reserves the right to waive irregularities and to accept or reject any and all bids submitted in response to this RFP, in whole or in part. Award It is the intent of Lake Fenton Community Schools to award the bid at the district's regularly scheduled Board meeting on Monday, February 14, 2022. The district requires the equipment and services to be delivered and installed by May 1, 2022. Work must be done outside of school hours and should be done so that no rooms are without a working PA speaker during the school day. The district is off for spring break the week of March 28, 2022. Submission of a bid will be construed as a conclusive presumption that the bidder is thoroughly familiar with the terms and conditions set forth in this RFP and agrees to abide by each and all of the stipulations and requirements contained therein. The district reserves the right to waive irregularities and accept or reject whole or partial bids based on criterion determined by the district to be in the best interest of the district. This criterion may include but is not limited to: (a) Real and/or perceived value of the equipment and services being proposed. (b) Ability of the equipment and/or services meeting the Districts stated and/or implied needs. (c) References and/or reputation of the bidder. (d) Stated and/or perceived ability of the bidder to meet the terms and conditions set forth in this RFP Equipment Specifications We are looking to replace all PA speakers and cabling. The existing Rauland TCU PA System should remain in place with additional modules added to support the speakers and zones. The following zones should be created: A Wing - individual zones for each room to allow the paging to be adjusted as room use changes B Wing - 1 zone for the entire hallway except B102 which should have it's own zone C Wing - 1 zone for the entire hallway except the gym which should have it's own zone D Wing - 1 zone for the entire hallway except the gym which should have it's own zone Outdoor speakers - 1 zone for all outdoor speakers We have identified the follow as preferred equipment that will meet the needs of this project. Qty Description 2 RAULand-TCC2022, Telecenter Campus Zone 1 RAULand -TCC2099, Universal Mounting Kit 80 Rauland | 2x2 Ceiling Speaker 9 Rauland |Vandal Proof Horn - Surface 1 Rauland - Amplifier 2 Siemon M2-5W | Punch Down Block Graybar-25-3-PC-10-GY| 10' 25 Pair Telco Cable 9 WES-25357BGN1000, 4C 22G STR 5 WES-25224BBK1000, 1P 18G STRD The pricing should be broken into two categories. The first category should be equipment, headend installation, and configuration. The second category should be cabling, cabling installation, and speaker installation. Estimated Project Cost: $20,000-$25,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Educational

$29,925.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
73
Bidding Soon
1,348
All Active Projects
550
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 18, 2022

February 17, 2022

img_map_placeholder

Multiple Locations, Fenton, MI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.