Published March 3, 2022 at 7:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Tucker, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of March 3, 2022. The project has been awarded in the amount of $547,492.18. Award at Council Meeting (Tentative) 2/15/2022 Completion from Date of Award 120 calendar days Deadline for Questions January 18, 2022 at 5:00 p.m. The City of Tucker, Georgia requests that interested parties submit proposals for the Ivey Oaks Subdivision Full Depth Reclamation Project. Proposals will be accepted until the date and time listed below and will be awarded to the responsive and responsible bidder whose bid, conforming with all the material terms and conditions of the ITB, is the lowest in price. QUESTIONS: Submit all questions in writing to procurement@tuckerga.gov reference Bid #2022-003. PRE-BID CONFERENCE: A pre-bid conference will not be scheduled for this project Addenda: Responses to questions received will be by addenda and will be posted on the City website www.procurement@tuckerga.gov. The signed acknowledgement issued with each addendum must be submitted with the proposal. It is the vendors responsibility to verify if any addenda were created. Your response must be received by the date and time specified. (Addenda will show any schedule updates) Late receipt of bids will not be considered regardless of postmark/carrier or email issues. Proposals received after the opening time will be filed unopened. The City of Tucker reserves the right to reject any and all proposals or any part, to waive any formalities or informalities to make an award and to re-advertise in the best interest of the City. No proposals received orally/phone. The City of Tucker (City), requests that interested parties submit formal electronic bids for the milling, patching, full depth reclamation, and resurfacing of 5 streets within the Ivey Oaks Subdivision. The contractor shall execute the work according to and meet the requirements of the following: o Georgia Department of Transportation (GDOT) Specifications, Standards, and Details; o The Contract Documents including but not limited to the scope of work, plans, and specifications; o City of Tucker ordinances and regulations; o OSHA standards and guidelines o MUTCD Guidelines o Any other applicable codes, laws and regulations including but not limited to Section 45- 10- 20 through 45-10-28 of the Official Code of Georgia Annotated, Title VI of the Civil Rights Act, Drug-Free Workplace Act, and all applicable requirements of the Americans with Disabilities Act of 1990. The contractor will be responsible for providing all labor, materials, and equipment necessary to perform the work. This is a unit price bid. Payment will be made based on actual work completed. The contractor is responsible for inspecting the jobsite prior to submitting a bid. No change orders will be issued for differing site conditions. Materials must come from GDOT approved sources. The contractor will be required to submit in writing for approval a list of proposed sources of materials. When required, representative samples will be taken for examination and testing prior to approval. The materials used in the work shall meet all quality requirements of the contract. Materials will not be considered as finally accepted until all tests, including any to be taken from the finished work have been completed and evaluated. Standard Specification 106 - Control of Materials will be used as a guide. All materials will be tested according to the GDOT Sampling, Testing, and Inspection Manual by an approved consultant/lab hired by the City. The successful bidder must have verifiable experience at construction of similar projects in accordance with these specifications. Bidder shall provide at least three examples and reference information (including company name, project name, contact name, phone number and email address) demonstrating experience successfully completing projects of similar scope. 10% retainage will be withheld from the total amount due the contractor until Final Acceptance of work is issued by the City. The City will inspect the work as it progresses

Award

Roads / Highways

$547,492.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
368
Active Projects
183
Bidding Soon
1,998
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 1, 2022

April 4, 2022

Project location map

Multiple Locations, Tucker, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.