Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a mixed-use development in Cedar Falls, Iowa. Completed plans call for site work for a playground / park / athletic field; and water / sewer project.
https://wcfcourier.com/news/local/work-begins-on-west-viking-road-industrial-phase-v-project/article_a8672022-664c-5d54-8b3a-7d9f8030bc07.html Mar 28, 2022 CEDAR FALLS -- Beginning this week, work will begin on the West Viking Road Industrial Park Phase V Project. Construction will be focused around the extension of Venture Way, Technology Place, and a new north/south road called Innovation Drive. This will complete the first loop into the new industrial park providing new industrial building lots along Venture Way and Innovation Drive. Work will include new storm sewer, sanitary sewer, water main, regional storm water detention ponds, a multiuse trail system, and other underground utilities. Construction for the project will be split into two major phases of construction throughout the year. For the first half of the construction season, crews will continue to work on mass grading operations across the entire site located south of Viking Road and East of Union Road. Grading operations will include placement of stormwater detention ponds, roadway grading, and also setting up developable lots. During this phase the contractor will also be starting underground utilities. Then in midsummer, crews will switch from mass grading operations to paving operations. Work will include installing the remaining underground utilities and then start the placement of the new roadway for the first extension of the industrial park. ________________________________________________________________________________________________ The work under the proposed contract shall commence within ten (10) calendar days after the date set forth in the written Notice to Proceed and shall be performed regularly and diligently throughout the duration of the project. The designated lot in the center of the site shall be pad ready no later than July 15th, 2022, with a fully constructed access road no later than August 15th, 2022. Liquidated damages in the amount of $2,000 per calendar day shall be assessed for each calendar day that the aforementioned lot and access road are not completed to the satisfaction of the Owner, for the purposes of allowing private development access to begin construction on said lot. The project shall be substantially complete with all roadways and utilities installed and open to the general public no later than November 30th, 2022. Liquidated damages in the amount of $2,000 per calendar day shall be assessed for each calendar day that roadways and utilities are not installed and operational after the substantial completion date. The Contractor shall fully complete the project no later than May 30th, 2023. Liquidated damages in the amount of $2,000 per calendar day shall be assessed for each calendar day that work remains uncompleted after the completion date. The City of Cedar Falls reserves the right to reject any and all proposals including without limitation, nonconforming, nonresponsive, unbalanced, or conditional bids.
Post-Bid
Playgrounds / Parks / Athletic Fields
$500,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 11, 2022
March 14, 2022
Viking Rd, Cedar Falls, IA
Related To This Project
Cedar Falls, IA
Bid Date: Jul 06 2023
Cedar Falls, IA
Bid Date: Jul 06 2023
Cedar Falls, IA
--
Cedar Falls, IA
Bid Date: Mar 07 2024
Cedar Falls, IA
Bid Date: Aug 10 2023
Cedar Falls, IA
Bid Date: Sep 12 2023
Cedar Falls, IA
--
Cedar Falls, IA
--
Cedar Falls, IA
Bid Date: Jun 15 2023
Cedar Falls, IA
Bid Date: Jun 15 2023
Cedar Falls, IA
Bid Date: Aug 11 2023
Cedar Falls, IA
Bid Date: Jun 29 2023
Cedar Falls, IA
--
Cedar Falls, IA
Bid Date: May 26 2023
Cedar Falls, IA
Bid Date: May 26 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.